Laserfiche WebLink
Jay Johnson <br /> EMCON <br /> January 30, 1995 <br /> Page 3 <br /> 7. The actual locations for the soil borings have not been selected, but at least <br /> one, and possibly two, should!',be across the street to the west, two to the north <br /> (probably in the sidewalk on the south side of Main Street) and one on the <br /> property. The sixth boring, which would become a monitoring well, would be <br /> on the property in the vicinity of the previously placed soil boring #1 and #2. <br /> After receiving the enclosed information, if you have any additions or changes to the <br /> investigation, please indicate that in your bid, along with the reason for such change and the <br /> cost. If you have any further questions or need further information, please call'. As we <br /> discussed and you can see from the correspondence, in order to remain in compliance to <br /> qualify for the cleanup fund, time is of the essence. <br /> Very truly yours <br /> FELIZABET R. BOGART <br /> ERB/pm <br /> Enclosures / <br /> cc: Andy Hyduke <br /> Michael Infurna, Senior REHS <br />