My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
800
>
2900 - Site Mitigation Program
>
PR0539293
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 3:22:36 PM
Creation date
11/20/2019 2:56:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0539293
PE
2957
FACILITY_ID
FA0022465
FACILITY_NAME
VALLEY MOTORS
STREET_NUMBER
800
Direction
E
STREET_NAME
MAIN
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
800 E MAIN
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t Messrs Trommer and La man "soil 16 June 2008 <br /> Preliminary Five-Year Review Letters Page 7 of 7 <br /> Various Sites <br /> 11530 Eight Mile Road, W. <br /> • The CUF recommended directing assessment and implementation of active <br /> remediation; the EHD agrees with the intent of the recommendation, but believes <br /> that that directive should be withheld until a pending report of findings from a <br /> recently complete deep delineation investigation and a pending SCM has been <br /> received and reviewed by the EHD. <br /> 14749 Thornton Road, N. <br /> • The CUF recommended evaluation of the sampling frequency and <br /> implementation of SVE/IAS. The EHD agrees with the recommendation; a RAP <br /> has been approved, the needed wells have been installed and the remediation <br /> system is under construction. <br /> 156157 th Street, S. <br /> • The CUF recommended implementation of active remediation without delay; the <br /> EHD agrees with this recommendation. A favorable pumping test has been <br /> completed and reported, DPE has been approved for the site, the system has <br /> .been installed.and.permits to operate are pending from the City and SJVUAPCD. <br /> 23569 Santa Fe Road,.S... <br /> • The CUF recommended termination of SVE and monitoring groundwater for one <br /> hydrological cycle.. The EHD agrees with the recommendation;. a work plan to <br /> install fourteen MIP borings on and off site has been approved. <br /> 800 Main Street, E.- <br /> The CUF agreed.with the EHD on the approved remedial work plan. <br /> Questions.or comments should be directed to the appropriate caseworker. <br /> Sincerely, <br /> Harlin Knoll, REHS. Michael-In rna, REHS <br /> Senior Registered Environmental Senior Registered Environmental <br /> Health Specialist Health Specialist <br /> Nuel Henderson, PG Margaret Ld4brio, REHS <br /> Engineering Geologist Program Coordinator <br /> 5-Year Review Comment Letter.061608.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.