My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
800
>
2900 - Site Mitigation Program
>
PR0539293
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 3:14:03 PM
Creation date
11/20/2019 3:01:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0539293
PE
2957
FACILITY_ID
FA0022465
FACILITY_NAME
VALLEY MOTORS
STREET_NUMBER
800
Direction
E
STREET_NAME
MAIN
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
800 E MAIN
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
until a discharge sample can confirm that the contaminants of concern are below <br /> reporting limits. The initial discharge,sample will be analyzed on ars expedited <br /> turnaround for the contaminants of concern: <br /> 5) Iter the discharge permit has been appro�red, water extraction will.resume at the <br /> established rate arrived at in step#3. Water samples will be-collected,_at <br /> approximately 2-3,000-galloA intervals as pumping continues They will be . <br /> analyzed ori a:standard turnaround for,TPH as gasoline and_BTEX. and the results <br /> will be graphed. Pumping will e6ntinue for approximately`3 weeks or until a. <br /> d scernable.eoncehtration decline curve;has.been established.' <br /> 3.0 SCHEDULE <br /> The initial test to establish a pumping rate and obtain the results'of a discharge sample <br /> (items 41-4)can be performed within ane:month of this work plan approval. lamer a <br /> discharge permit is issued, iterh:#5_could be completed within a month and a report <br /> ;; completed within a month thereafter. <br /> - f <br />
The URL can be used to link to this page
Your browser does not support the video tag.