Laserfiche WebLink
TABLE 5 Field Measurements and Estimate of Processed Product <br /> Project: Valley Motors,800 E. Main Street,Stockton, CA <br /> Duration Processed Air Measurements Product Total Product Removed <br /> o(Operation Processed Removal This <br /> Date in Period Air PID PID Rate Period Cummulative Notes <br /> (hours) (CFM) Influent Emuent PH(lblday) TPH(lbs) TPH(lbs) <br /> 11/22/2005 05 225 550 20 404 0 8 0 8 <br /> 12/12/2005 1 200 400 14 330 14 22 Lab TPH-g=571 ppmv <br /> 12/19/2005 36 200 400 14 261 392 414 <br /> 12/29/2005 127 175 225 11 191 1013 1427 <br /> 1/5/2006 168 180 205 10 125 873 2300 <br /> 1/12/2006 126 180 195 12 118 618 2918 Lab TPH-g=242 ppmv <br /> 1/19/2006 144 185 205 10 119 716 363 3 Power Outage <br /> 1/27/2006 123 170 223 9 12 4 63 6 4270 <br />