r
<br /> OUINTANA PETROLEUM CORPORATION SHEET D
<br /> DRILLING RECORD CONFIDENTIAL
<br /> PAGE NO, 1
<br /> :1
<br /> AFE 056622
<br /> LEASE 9ROV ' I WELL NO. 1-8 FIELD
<br /> A DtTAILS Or optRATIONS. DESCRIPTION{ Y RCb
<br /> Location: 1200' FEL 6 600' FSL
<br /> NE :.•W NW Section 8, T4N-R6E
<br /> San Joaquin County, California
<br /> 10/22/86 MIRU Gary Drilling Rig #16. Expect to spud 10/23/86. ~�
<br /> 10/23/86 RU Gary Rig #16. Expect to spud this afternoon.
<br /> 10/24/86 535' Day 1. Drld 495' WOC,
<br /> clay and sd, MW 9,8, vis 40, WL 10.5.
<br /> 1° @ 260' . V @ 535'. SPUD at 1600 hrs 10/23/86. Drld to 535'Surveys:
<br /> , made
<br /> clean up trip to surf, POOH. Ran 13 jts 2411 csg, set at 534.151. Cmt
<br /> using BJ Titan w/131 sx Class G + 8% gel, 37. CaC12, followed by 100 ax
<br /> G + 3% CnCl2/ Total volume 354 cu ft. Displace w/180 cu ft mud.
<br /> Bump plug w/1000 pis. Release press, float held. CIP at 0245 hrs 10/24/86.
<br /> Had 50 cu ft clean cmt returns. WOC 6 hrs, cut off csg, install csg head, 1.
<br /> NU BOPE. DC: $5028 CTD: $21,986
<br /> 10/25/86 1671' Day 2. Drld 1136' , drlg, ss, clay, sd, MW 9,2, via 38, WL 10.2.
<br /> Durvey: 1° @ 1205', Fin WOC. Weld and test csg head to 700 psi. NU
<br /> and test BOPE to 1500 psi and annular to 1000 psi. Witnessed by Hike
<br /> Cummings w/D,O.G, NDA at 16711,
<br /> DC: $20,863 CTD: $42,669
<br /> 10/26/86 3865' Day 3. Drld 2194', drlg, sd and clay, MW 9,6, vis 40, WL 7.9. Surveys:
<br /> k° @ 1948', 1*
<br /> @ 2690', V @ 3156'. Drld to 31561, TFB 02, NDA at 3865'. 1'
<br /> DC: $8010 CTD: $50,679 V�
<br /> 10/27/86 4400' Da 4,
<br /> 2°y@ Drld
<br /> WOO , sd and clay, MW 9.6, vis 39, WL 7.8. Surveys:
<br /> Drld to 3928' , wipe hole, drl to 44001, wipe
<br /> hole, circ and cond, TOOH, Log,
<br /> DC: $12,575 CTD: $63,254
<br /> 10/28/86 TD 4400' Day 5. WOO, LS DC. TIH OE and plug well as follows:
<br /> Plug #1: 1765'-1365' w/118 sx "G" + 3% CaC12
<br /> Plug 02: 586'- 486' w/ 60 sx "G" + 37. CaCl
<br /> Plug #3: 518'- 450' w/ 30 sx "G" + 2
<br /> 3
<br /> Plug 114: 30'-surf w 3% a
<br /> CaC12
<br /> LD DP, ND BOPE, cut off wellhead, clean mud tanks. Rig released
<br /> at 0400 hrs 10/28/86. Well plugged and abandoned. FINAL REPORT. i.
<br /> DC: $21,230 CTD: $84,521 Ki..
<br /> 8 5/8" CASING DETAIL _
<br /> 10/24/86
<br /> 1 8 5/8" Baker guide shoe
<br /> 1 jt 8 5/8" 24/l K- 1.04'
<br /> 55 8Rd ST&C R-3 Casing 42.12'
<br /> 1 - 8 5/8" Insert . . "'
<br /> 12 jts 8 5/8" 2411 K-55 8Rd ST&C R- 0.00'
<br /> 3 Casing "' 495.51' l
<br /> Total casing run
<br /> Casing cut off 538.61'
<br /> Casing in hole . , .... ����"���'
<br /> 17.02'
<br /> RKB to C11F 521.6 ;y
<br /> Casing set at .................................. +12.50'
<br /> 534.15r
<br /> r1
<br /> r:.
<br /> �i
<br />
|