My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0000087 SSC RPT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FOREST LAKE
>
1120
>
2600 - Land Use Program
>
MS-99-09
>
SU0000087 SSC RPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2019 10:20:56 AM
Creation date
11/21/2019 9:48:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSC RPT
RECORD_ID
SU0000087
PE
2622
FACILITY_NAME
MS-99-09
STREET_NUMBER
1120
Direction
W
STREET_NAME
FOREST LAKE
City
ACAMPO
ENTERED_DATE
8/8/2001 12:00:00 AM
SITE_LOCATION
1120 W FOREST LAKE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOURCES AGENCY OF CALIFORNIA <br /> DEPARTMENT OF CONSERVATION 686-406 <br /> DIVISION OF OIL AND GAS No. P <br /> REPORT ON PROPOSED OPERATIONS (lield code) <br /> WELL CLASSIFICATION: Exploratory-Outpost (area code) <br /> _Mr. James R . Weddle , Agent (new pool code) <br /> —QUINTANA PETROLEUM CORP.aG (old pool code) <br /> =_ 1400 Easton Dr- , Suite 133 potaberd California <br /> RkPrfiPld, CA 9 309 <br /> Yourproposal to drill ell "BrOVelli" 1-8 <br /> A.P.I. No. 077-204 7 Section T. , R. B. & <br /> -- field, -- area, -- <br /> pool, <br /> San .Toaq rLi n County, dated—9/29 86 ,received 10/l/86— <br /> has been examined in conjunction with records <br /> filed in this office. <br /> THE PROPOSAL IS APPROVED PROVIDED THAT: <br /> 1. The 8-5/8" casing is cemented with sufficient cement to fill behind this casing <br /> from the shoe to the ground surface. <br /> 2. The 5-1/2 to casing is cemented with sufficient cement to fill behind this casing <br /> from the shoe to at least 500 feet above the uppermost oil or gas zone. <br /> 3. Drilling fluid of a quality and in sufficient quantity to control all subsurface <br /> conditions in order to prevent blowouts is used. <br /> 4. Blowout prevention equipment conforming to Class III B 2M requirements is installed <br /> on the 8-5/8 11 casing and maintained in operating condition at all times. See <br /> Manual M07 and attached sheet. <br /> 5. Blowout prevention equipment conforming to Class "III" 2 M requirements is installed <br /> on the 5-1/2" casing and maintained in operating condition at all times. See <br /> Manual M07 and attached sheet. <br /> 6. Fresh water protection for this well shall be as shown on attached exhibit A. <br /> 7. The division is furnished copies of any draw down or back pressure tests performed. <br /> in addition the division will monitor the production for a period of six months and <br /> if anomalous water production is indicated, remedial action will be ordered. <br /> 8. THIS DIVISION IS NOTIFIED: <br /> a. Before deviating from the proposed casing program and/or placing any plugs in the <br /> hole. Additional requirements shall be outlined at that time. <br /> b. To witness a test of the installed blowout prevention equipment prior to drilling <br /> out the shoe of the 8-5/8" casing. The blind/blank rams shall be tested by the <br /> operator prior to calling the Division inspector. Test information of the blind/ <br /> blank ram test shall be entered on the tour sheet along with the signature of the <br /> person in charge. <br /> NOTE: 1. Information on file in this office indicates that the base of the useable <br /> fresh water deposits should be encountered at a depth of approximately 16501 <br /> 2. This well has been granted confidential status for two years fom the <br /> cessation of drilling operations. <br /> Blanket Bond <br /> RLH/sd <br /> CONFIDENTIAL <br /> c c : Co. CO. M. G. M F Sta ii and Gas Supervisor <br /> FTBy <br /> Deputy Superwscr <br /> John C. Sullivan <br /> A copy of this report and the proposal must be posted at the well site prior to commencing operations. <br /> Records for work done under this permit are due within 60 days after the work has been completed <br /> or the operations have been suspended. <br /> OG111 (11/82/DWRR/5M) <br />
The URL can be used to link to this page
Your browser does not support the video tag.