Laserfiche WebLink
Production Ca` sing Cement: Volumes and <br /> slurf'?—d-esigns wil'r-F e provided after in- <br /> spection of open hole logs . <br /> PRODUCTION CASING: 5 1/2" 15 . 5# K-55 ST&C set at 4400 ' <br /> LOGGING PROGRAM: Log well at TD. Service company to be <br /> selected. Tentative program is as follows : <br /> DIL-GR-SP - TD to BSC <br /> BHC-Sonic-GR - TD to BSC <br /> *FDC-CNL-GR-Cal - Minimum run <br /> *Check with Engineering Department prior to <br /> running the FDC-CNL log. <br /> DRILL STEM TESTS: None scheduled at this time. <br /> DEVIATION SURVEYS : Max. Rate *Survey <br /> Depth Max. L _✓_ of Change Intervals <br /> 0 ' -500 ' 1 deg 1 deg/300 ' 250 ' <br /> 500 ' -TD 4 deg 1 deg/300 ' 1000 ' <br /> *Survey intervals will be based on severity <br /> of hole angle, but not to exceed 250 ' in <br /> surface hole and 1000 ' from BSC to TD. <br /> SPECIAL EQUIPMENT : I . Manned mud logging unit fully opera- <br /> tional from 500 ' to total depth. <br /> Vendor to be selected. <br /> 2 . Totco single shot deviation tool (drift <br /> only) . <br /> 3 . TIW and inside BOP to fit drill pipe <br /> with crossovers to fit drill collars <br /> on floor at all times . <br /> 4 . Have Flo-Sho operational from BSC . <br /> HOLE SIZE: 12 1/4" - (0 ' - 5001 ) <br /> 7 7/ 8" - (500 ' - TD) <br /> CUTTING SAMPLES : Every 20 ' from base of surface casing to <br /> 4400 ' (1 set paleo and 1 set dry) . Hold <br /> at rig. <br /> CONSULTING GEOLOGIST: To be selected. To be on well at total <br /> depth . <br /> -2- <br />