Laserfiche WebLink
• Remove respirator, remove cartridges and discard them. Return respirator to <br /> storeroom at the end of the job. All respirators will be properly washed, sanitized, <br /> tagged and stored. <br /> ■ The garbage bag(s) holding disposable items from the site operations will be placed <br /> in securely covered, clearly marked 55-gallon steel drums and placed in an area of <br /> the site at the direction of the Site Safety Officer. Final disposition will be in <br /> accordance with site remedial action. <br /> • Wash hands and face with soap immediately upon exiting the Exclusion Zone. <br /> • After departing the site, site operations personnel should shower as soon as possible. <br /> • After departing the site, fabric work clothes and undergarments should be washed as <br /> soon as possible using routine wash method. <br /> • Each piece of equipment (tools and all vehicles taken inside the exclusion zone) must <br /> be decontaminated before it leaves the operation site. This must be done in an area <br /> designated for equipment decontamination. Large items of equipment, such as <br /> backhoes, vehicles and trucks, should be subjected to decontamination by high <br /> pressure water washes or steam. A special solution, such as Liqui-Nox, a 1% to 2% <br /> TSP solution, or Bola Degreaser, may have to be used on sampling equipment or <br /> heavily soiled items. All wash and rinse water must be contained (on Visqueen for <br /> large equipment, in 5-gallon buckets for tools), collected, and disposed of as <br /> required. <br /> • For decontamination of personnel involved in an accident, refer to the Emergency <br /> Procedures section of this document (page 11). <br /> PHYSICAL HAZARDS <br /> The physical hazards associated with operating a drill rig are as follows: <br /> • Moving machine parts <br /> • Heavy equipment <br /> • Noise <br /> • Exposure to contaminated particulate matter while moving drill cuttings <br /> • Possible contact with gas or power lines during excavating <br /> All personnel operating the drill rig must be very familiar with its operating procedures and <br /> the safety precautions to be taken. They must know how to shut it off in case of an <br /> emergency. <br /> rIM-I1.a«cnz-n Page 9 <br />