Laserfiche WebLink
Spill Bucket Testing Report <br /> 1 . FACILITY INFORMATION <br /> Facility Name: ARCO AM PM # 83333 Date of Testing: 10/24/2018 <br /> Facility Address: 550 W. Vaipico Ave. Tracy, CA 95376 <br /> Facility Contact: Edgar Phone: (925) 548-7910 <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Diamond Petroleum Services, Inc. <br /> Technician Conducting Test: Guadalupe Sanchez <br /> Contractor License # 1005444 ICC Certification # 5250451 <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> E <br /> d: Hydrostatic <br /> Used: Standard Tape Measure Equipment Resolution: 1 / 16" <br /> cket (By Tank Tl : 87 M West Fill Tl : 87 M East Fill T2 : 91 Fill T3: Diesel Fill <br /> Product, etc. <br /> Bucket Installation Type: Direct Bury Direct Bury Direct Bury Direct Bury <br /> x Contained in Sump x Contained in Sump x Contained in Sump x Contained in Sum <br /> Bucket Inside Diameter: 12 12" 12 12" <br /> Bucket Depth: 15 151/2 16" 16 ''/4" <br /> Wait time between applying 5 minutes 5 minutes 5 minutes 5 minutes <br /> vacuum/water and start of test: <br /> Test Start Time (TI) : 2 : 15 p.m. 2: 10 p.m. 2 :05 p.m. 2:00 p.m. <br /> Initial Reading (Rt): 143/8 14 '/Z" 15 '/4" 15" <br /> Test End Time (TF): 3 : i 5 p.m. 3 : 10 p.m. 3 :05 p.m. 3 :00 p.m. <br /> Final Reading (RF): 143/8 14 %s" 15114 15" <br /> Test Duration (TF — Ti): 1 hr l hr 1 his 1 his <br /> Change in Reading (RF - RI): 0 0 0 0 <br /> Pass/Fall Threshold or 1 /8" 1 /8" 1 /8" 1 /8" <br /> Criteria: <br /> Test Result: 1 x Pass ❑ Fail x Pass ❑ Fail x Pass 0 Fail x Pass ❑ Fait <br /> Comments : <br /> Technician ' s Signatu • ��� Date: 101242018 <br />