My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
INSTALL_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2019 3:04:39 PM
Creation date
11/25/2019 11:13:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2014
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. TO BE SUBMITTED PRIOR TO THE FINAL INSPECTION: <br /> ❑ Complete to scale As-Built Plans <br /> ❑ Complete Monitoring and Response Plan <br /> ❑ UPCF Underground Storage Tanks - Installation Certificate of Compliance (one <br /> form per tank) <br /> ❑ Completed Underground Storage Tank Certification of Financial Responsibility <br /> form along with any required attachments <br /> ❑ Passing Line Leak Detector Test Results <br /> ❑ Passing Line Tightness Test Results (Required if the UST system does not satisfy <br /> the California Code of Regulations 2636(8) for automatic pump shut-off.) <br /> ❑ Passing Enhanced Leak Detection Results <br /> D. INSPECTIONS: <br /> (Vote: A representative from the San Joaquin County Environmental Health Department <br /> must Wtness all activities described below. <br /> ❑ Tank holiday test (for fiberglass-coated steel tanks) performed prior to <br /> installation in excavation <br /> ❑ Inspection of tank vacuum gauge (if applicable) prior to placement in excavation <br /> ❑ Tank soap test (for fiberglass tanks) performed prior to installation in excavation <br /> ❑ Verification of tank set and anchorage in excavation <br /> ❑ Primary piping including product piping, vapor recovery and vent line piping <br /> soap and pressure test <br /> ❑ Secondary piping including product piping; vapor recovery and vent line piping <br /> soap and pressure test <br /> ❑ 24-Hour secondary containment lake test on sumps and under-dispenser <br /> containment <br /> ❑ Piping Slope & cathodic protection prior to covering <br /> ❑ Overfill performance test <br /> ❑ Prior to receiving fuel, a complete functional test of tank and piping monitoring <br /> system(s) including overfill prevention <br /> ❑ Final inspection and demonstration of automatic shut down (if applicable). <br />
The URL can be used to link to this page
Your browser does not support the video tag.