Laserfiche WebLink
JNIFIED PROGRAM CONSOLIDATED FOR 'AI TANK: TA0515429 <br /> C {'1 U (yel PR#: PRO231055 <br /> ' J ✓ FAC#: FA0002321 <br /> UNDERGROUND STORAGE TANKS - TAN A 2 <br /> VI.PIPING CONSTRUCTION(Check all that apply) Page 3 ors <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE ❑ 1.PRESSURE [:12.SUCTION ❑ 3.GRAVITY 458 ❑ 1.PRESSURE [:12.SUCTION ❑3.GRAVITY 459 <br /> CONSTRUCTION ❑1.SINGLE WALL ❑3.LINED TRENCH ❑99.OTHER 460 ❑ I.SINGLE WALL ❑95.UNKNOWN 462 <br /> ❑2.DOUBLE WALL 095.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER 461 MANUFACTURER 463 <br /> ❑ 1.BARE STEEL ❑6.FRP COMPATIBLE w/100%METHANOL ❑ 1.BARE STEEL ❑ 6.FRP COMPATIBLE w/100%METHANOL <br /> ❑2.STAINLESS STEEL ❑ 7.GALVANIZED STEEL ❑2.STAINLESS STEEL ❑ 7.GALVANIZED STEEL <br /> ❑PLASTIC COMPATIBLE W/CONTENTS ❑ 95.UNKNOWN ❑ PLASTIC COMPATIBLE W/CONTENTS ❑ 95.UNKNOWN <br /> ❑4.FIBERGLASS ❑ 8.FLEXIBLE(HDPE) ❑ 99.OTHER ❑4.FIBERGLASS ❑ 8.FLEXIBLE(HDPE) ❑99.OTHER <br /> ❑5.STEEL W/COATING ❑9.CATHODIC PROTECTION 464 ❑ 5.STEEL W/COATING ❑9.CATHODIC PROTECTION 465 <br /> VII.PIPING LEAK DETECTION(Check all that apply)(A description or the monitoring program shall be submitted to the local agency.) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466 SINGLE WALL PIPING 467 <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> ❑ I.ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP SHUT OFF ❑ 1.ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP SHUT OFF <br /> FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+AUDIBLE AND FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+AUDIBLE AND <br /> VISUAL ALARMS. VISUAL ALARMS. <br /> ❑2.MONTHLY 0.2 GPH TEST ❑2.MONTHLY 0.2 GPH TEST ❑3.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑3.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑4.DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑ 5.DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIEAL PIPING ❑5.DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) ❑6.TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALUES IN BELOW GROUNDPIPING): SAFE SUCTION SYSTEMS(NO VALUES IN BELOW GROUNDPIPING): <br /> ❑7.SELF MONITORING <br /> ❑7.SELF MONITORING <br /> GRAVITY FLOW <br /> ❑9.BIENNIAL INTEGRITY TEST(0.1)GPH GRAVITY FLOW(Check all that apply): <br /> ❑8.DAILY VISUAL MONITORING <br /> ❑9.BIENNIAL INTEGRITY TEST(0.1)GPH <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10.CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10.CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ALARMS AND(Check one) <br /> ❑a.AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a.AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ❑b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> ❑c.NO AUTO PUMP SHUT OFF ❑c.NO AUTO PUMP SHUT OFF <br /> ❑ 11.AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT OFF OR ❑ 11.AUTOMATIC LEAK DETECTOR <br /> RESTRICTION <br /> ❑ 12.ANNUAL INTEGRITY TEST(0.1 GPH) ❑ 12.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> ❑ 13.CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS ❑ 13.CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Chale all that apply) <br /> ❑ 14.CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF• ❑ 14.CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> 15.AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOW ❑ 15.AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOW <br /> SHUT OFF OR RESTRICTION SHUT OFF OR RESTRICTION <br /> ❑ 16.ANNUAL INTEGRITY TEST(0.1 GPH) ❑ 16.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑ 17.DAILY VISUAL CHECK ❑ 17.DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT ❑ I.FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4.DAILY VISUAL CHECK <br /> DATE INSTALLED 468 ❑2.CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5.TRENCH LINER/MONITORING <br /> ❑3.CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR ❑6.NONE <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS 469 <br /> IX.OWNERIOPERATOR SIGNATURE <br /> I certify that the information provided herein is true and accurate to the bst or my knowledge. <br /> SIGNATURE OF OWNER/OPERATOR DATE 470 <br /> NAME OF OWNER/OPERATOR(print) TITLE OF OWNER/OPERATOR <br /> 471 472 <br /> Permit Number(For local use only) 473 Permit Approved(For local use only) 474 Pmnit Expiration Date(Fa local use only) 475 <br /> PT0002313 EE0000817 2/28/2010 12:00:OOAM <br /> UPCF(12/99 revised) <br />