My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012654
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CARROLTON
>
19729
>
2600 - Land Use Program
>
PA-1900168
>
SU0012654
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2020 3:53:16 PM
Creation date
11/26/2019 9:15:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012654
PE
2690
FACILITY_NAME
PA-1900168
STREET_NUMBER
19729
Direction
S
STREET_NAME
CARROLTON
STREET_TYPE
RD
City
RIPON
Zip
95366-
APN
24513061, 24538020, 24538021, 24538036
ENTERED_DATE
11/20/2019 12:00:00 AM
SITE_LOCATION
19729 S CARROLTON RD
RECEIVED_DATE
11/20/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> & Electric Company' <br /> service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG&E Corrosion Engineering. <br /> 12. Pipeline Marker Signs: PG&E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br /> With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work. The pipeline marker must be moved back once construction is <br /> complete. <br /> 13. PG&E is also the provider of distribution facilities throughout many of the areas within <br /> the state of California. Therefore, any plans that impact PG&E's facilities must be reviewed and <br /> approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities. <br /> PG&E Gas and Electric Facilities Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.