Laserfiche WebLink
� —GEIVEL <br /> Monitoring System Certification SEP 10 2015 <br /> UST Monitoring Site Plan ENVIRONMENTAL <br /> Site Address: DELTA ARCO 440 W.CHARTER WAY STOCKTON CA 95210 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> NORTH. <br /> CHARTERWAY <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . <br /> . EMC . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . <br /> 5. 6 . . . . . . . . . . . 1 .❑ .2 <br /> . . . . . . . . . . . . . . . . <br /> . . . . . STORE <br /> . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . <br /> 7 8. . . . . . . . . . . .P . . . . . . . . 3. . 4. . . <br /> . . . . . . . . . . . . . . POWER PANEL . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> ANNULAR <br /> V=VAPOR . . . . . O <br /> =208 TURBINE SENSOR <br /> FILL <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 <br /> \' <br /> . . . . . . . . . . . . . . . . . . . . . . . . A O <br /> Date map was drawn: 8-18-2014 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />