My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_2012 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:47:04 PM
Creation date
11/26/2019 9:20:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2018
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page _ of <br /> 8. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> "Fest Method Developed By: UDC Manufacturer Industry Standard X Professional,E,ngineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure Vacuum X Hydrostatic JNIVIE1 <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> UDC#9&10 UDC# 11&12 UDC# UDC# <br /> UDC MaiUf£1CLUrCr: Western Western <br /> UDC Material: Poly Plastic Poly Plastic <br /> UDC Depth: 24" 24" <br /> Height from UDC Bottom to Top 7" 7" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Enters from bottom Enters from bottom <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry <br /> testing: <br /> Portion of UDC Tested Water Level 9" Water Level 9" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes Yes <br /> product and water)?` <br /> Turbine shutdown response time Not Alarmed Not Alarmed <br /> Is system programmed for fail- Yes Yes <br /> safe shutdown?* <br /> Was fail-safe verified to be No No <br /> operational?* <br /> Wait time between applying 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 11:10 11:15 <br /> Initial Reading(Rt): .001 .001 <br /> Test End Time: 11:40 11:45 <br /> Final Reading(RF): .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes <br /> Change in Reading(RF-Rt): 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass <br /> Was sensor removed for testing? Yes Yes <br /> Was sensor properly replaced and Yes Yes <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.