My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_2012 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:47:04 PM
Creation date
11/26/2019 9:20:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2018
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Re: 440 Dr. Martin Luther King Blvd. RECEIVED <br /> From: William Ross APEC <br /> American Petroleum Environmental Construction NOV 2 5 2014 <br /> P.O. Box 55105 Stockton Ca. 95205 ENVIRONMENTAL HEALTH <br /> Ph 209-943-3000 DEPARTMENT <br /> Fax 209-943-3003 <br /> Cell 209-479-0289 <br /> 1. Install the two dispensers provided by Owners. <br /> 2. Saw cut-break-out concrete. Haul off Concrete. <br /> 3. Coordinate with Owners Electrician for wiring of petroleum equipment. <br /> 4. Supply and install UDC (Under dispenser Containment). <br /> 5. Supply and install all Petroleum Piping. <br /> 6. Supply and install all Shear-valves, stainless steel couplers. <br /> 7. Supply and install all entry-boots, fittings for petroleum piping. <br /> 8. Supply and install all fiberglass piping and connect to petroleum existing lines. <br /> 9. Supply and install monitoring device for UDC. <br /> 10. Connect and Program owners TLS 350 at new location. <br /> 11. Supply and install ISD flow meters to each dispenser including programing. <br /> 12. Supply and install one Smart sensor module/with programing. <br /> 13. Supply and install New hanging hardware. <br /> 14. Supply Two metal bollards to match existing. <br /> 15. APEC Will Make all electrical and cable connections to dispensers and TLS and related <br /> equipment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.