My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000 - 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_2000 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:51:24 PM
Creation date
11/26/2019 1:07:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2011
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S WRCB, January 2002 Page -of .- <br /> 7. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑ Pressure 0 Vacuum hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: C ttjL0e (, l i eCt cr/ Equipment Resolution: ,062 <br /> + UDC# 'Z UDC# UDC# I AIDC# <br /> UDC Manufacturer: tomes A evo <br /> UDC Material: <br /> UDC Depth: c{" <br /> Height from UDC Bottom to Top , <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Eh l�✓s Yo►+� i } <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to t i <br /> testing: TY`� <br /> Portion of UDC Tested i vq E cr Zx eL <br /> Does turbine shut down when 1 <br /> UDC sensor detects liquid(bothWes ❑No ❑NA 0 Yes 1 11 NO El NA C1 Yes` ❑No l❑NA ❑Yes 0 NO ❑NA <br /> product and water)?' ^ I ij <br /> Turbine shutdown response time N tl + Rr 1a"'M(. 1. <br /> Is system programmed for fail- Yes ❑No ❑NA 0 Yes t]I o ❑NA 0 Yes 0 0 NA ❑Yes 0 0 ❑NA <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑ Yes No 0 NA ❑Yes o ❑NA 0 Yes ❑ o ❑NA ❑Yes No ❑NA <br /> o erational?' <br /> Wait time betweenZing <br /> pressure/vacuum/I nd <br /> starting test Vu✓5 <br /> Test Start Time: <br /> Initial Reading(111): oo <br /> Test End Time: ! : L( ' <br /> Final Reading(RF): v 0(�, <br /> Test Duration: 3 o r,-r rt u 4 Y <br /> Change in Reading R -Rt : 1 v o <br /> Pass/Fail Threshold or Criteria: o e f 13D PY M ; <br /> Test Result: ❑ Pass wall Ev Pass 0NA <br /> ❑ Pass 0 Fall Pass C1Fall <br /> Was sensor removed for testing? es ❑No ❑NA ❑ es ❑No 0 Yes- ❑No ElA Yes 0 No 01NA <br /> Was sensor properly replaced and yes ❑No ❑NA Yes ❑No 0 0 Yes ❑No ❑ 0 Yes ❑No 0 N <br /> verified functional after testing? <br /> Comments— include information on repairs,made prior to testing, and recommended ollow-u or ailed tests <br /> Pd- ct5 Gt sivia (( ColfStS mac-{ LuS< Uv4Y 'f �wy Oour Pyida , <br /> Goca / e 5041",r_,9 0 tej 55. IA., '411 �rl � tr ->4e1w a <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*) is"NO"or"NA", the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.