Laserfiche WebLink
F. In-Tank Gauging 1 SIR Equipment: ® Check this box if tank gauging is used only for Inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No' Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> ❑ Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No' Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No' Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Com lete the followin checklist: Y) <br /> ❑ Yes ElNo' For equipment start-up or annual equipment' <br /> tcertification, was a leak simulated to verify LLD performance? (Check all that aPP <br /> 1 <br /> ❑ NIA Simulated leak rate: ❑3 g p• E]0.1 g p E] g p'h <br /> ❑ Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No' Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑ N/A <br /> 171 Yes [I No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑ NIA <br /> ❑ Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑ Yes ❑ No. Were all items on the equipment manufacturer's maintenance checklist completed? <br /> Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Comments: NO FUEL TO DO LEAK DETECTOR TESTING AT THIS TIME <br /> Monitoring System Certification Page 3 of 4 2/21107 <br />