My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000 - 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_2000 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:51:24 PM
Creation date
11/26/2019 1:07:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2011
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 4 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer <br /> Other (Sped) <br /> Test Method Used: FI Pressure F Vacuum x❑ Hydrostatic <br /> ❑ Other (Sped) <br /> Test Equipment Used: vplt Equipment Resolution: vplt to gph <br /> tiump# 1 REG Sump# 2 SUP Sump# Sump# <br /> Sump Diameter: 48" 48' <br /> Sump Depth: 71" 71 <br /> 11 <br /> Sump Material: fiberglass fiberglass <br /> Height from Tank Top to Top of 1211 1211 <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 15" 1511 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good <br /> Portion of Sump Tested: 1 1411 14 <br /> Does turbine shut down when <br /> sump sensor detects liquid(bothX❑Yes❑No❑N MYes�No❑N Yes❑No❑N Yes�No❑NA <br /> product and water)?* <br /> Turbine shutdown response time: 2-5sec 2-5sec <br /> Is system programmed for fail-safe ❑ � ❑ � ❑ ❑ `E] ❑ ❑ <br /> shutdown?* Yes N N X Yes N N Yes N N Yes No[:]NA <br /> Was fail-safe verified to be ayes E]NoE]N aYes❑No❑N aYes�No�N ayes allo❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min <br /> test: <br /> Test Start Time: 9:2 6 9:2 4 <br /> Initial Reading(RI): 7.671 7.524 <br /> Test End Time: 9 :56 9:54 <br /> Final Reading(RF): 7.336 7.524 <br /> Test Duration: 3 0 m i n 3 Omi n <br /> Change in Reading(RF-RI ): . 0 2 gph .0 0 Ogph <br /> Pass/Fail Threshold or Criteria: .05g—ph . 05gph <br /> Test Result: Pass El Fail Pass ElFail ❑ Pass 1-1FailPass Fail <br /> Was sensor removed for testing? X Yes❑NNA X Yes N NA Yes NoLJNA Yes[:]No❑N <br /> Was sensor properly replaced and X❑ s0 [:] � � a aJNA <br /> verified functional after testing? 1111YesE:]NcE]NA Ye N NA Ye N NA Yes N <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> I If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.