Laserfiche WebLink
SWRCB,January 2002 Page 4 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer <br /> Other (Sped) <br /> Test Method Used: FI Pressure F Vacuum x❑ Hydrostatic <br /> ❑ Other (Sped) <br /> Test Equipment Used: vplt Equipment Resolution: vplt to gph <br /> tiump# 1 REG Sump# 2 SUP Sump# Sump# <br /> Sump Diameter: 48" 48' <br /> Sump Depth: 71" 71 <br /> 11 <br /> Sump Material: fiberglass fiberglass <br /> Height from Tank Top to Top of 1211 1211 <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 15" 1511 <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good <br /> Portion of Sump Tested: 1 1411 14 <br /> Does turbine shut down when <br /> sump sensor detects liquid(bothX❑Yes❑No❑N MYes�No❑N Yes❑No❑N Yes�No❑NA <br /> product and water)?* <br /> Turbine shutdown response time: 2-5sec 2-5sec <br /> Is system programmed for fail-safe ❑ � ❑ � ❑ ❑ `E] ❑ ❑ <br /> shutdown?* Yes N N X Yes N N Yes N N Yes No[:]NA <br /> Was fail-safe verified to be ayes E]NoE]N aYes❑No❑N aYes�No�N ayes allo❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min <br /> test: <br /> Test Start Time: 9:2 6 9:2 4 <br /> Initial Reading(RI): 7.671 7.524 <br /> Test End Time: 9 :56 9:54 <br /> Final Reading(RF): 7.336 7.524 <br /> Test Duration: 3 0 m i n 3 Omi n <br /> Change in Reading(RF-RI ): . 0 2 gph .0 0 Ogph <br /> Pass/Fail Threshold or Criteria: .05g—ph . 05gph <br /> Test Result: Pass El Fail Pass ElFail ❑ Pass 1-1FailPass Fail <br /> Was sensor removed for testing? X Yes❑NNA X Yes N NA Yes NoLJNA Yes[:]No❑N <br /> Was sensor properly replaced and X❑ s0 [:] � � a aJNA <br /> verified functional after testing? 1111YesE:]NcE]NA Ye N NA Ye N NA Yes N <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> I If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />