Laserfiche WebLink
Comments: <br /> __ry -t, 1�_>�Q C 1A_S r1J <br /> Items Requiring Follow-Up Actions: <br /> Instructions: <br /> Monthly visual inspection of the UST system must be conducted by a Designated UST Operator, who <br /> possesses a current"California UST System Operator"certification issued by the International Code <br /> Council. <br /> A copy of this monthly visual inspection checklist must be provided to the UST Owner or Operator, but <br /> not to the State Water Resources Control Board. <br /> The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during <br /> the monthly visual inspection that may require follow-up actions. <br /> Page 3 of 2 November 2004 <br />