My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000 - 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_2000 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:51:24 PM
Creation date
11/26/2019 1:07:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2011
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> N <br /> Sump#1-87 Sump#2-91 Sump# Sump# <br /> Sump Diameter: 42" 42" <br /> Sump Depth: 40" 40" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 14"Vapor 17"Vapor <br /> Highest Piping Penetration: 13"Product 13"Product <br /> Height from Tank Top to Lowest 16" 16" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' Water Level 18" Water Level 19" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes <br /> product and water)9* <br /> Turbine shutdown response time Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe Yes Yes <br /> shutdown?* <br /> Was fail-safe verified to be No No <br /> operation l?* <br /> Wait time between applying water 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 8:45 8:35 <br /> Initial Reading(RI): .001 .001 <br /> Test End Time: 9:15 9:05 <br /> Final Reading(RF): .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes <br /> Test Result: X Pass ❑Fail X Pass ❑Fail Pass ❑Fail Pass ❑Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include infornxNion on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.