Laserfiche WebLink
Sent By: RHL DESIGN GROUP; 7077656835; Dec-22-98 4:12PPI Page 21 /27 <br /> 1ZlZZ/Nq 11r I-).LU rAA oq•aot a• -- <br /> 4 <br /> to MTIM11,11M lW MTN <br /> SCOPE OF WORK: Equilon Enterprises has retained K.E. Curtis Construction Co., Inc. to <br /> upgrade site as required to meet EPA regulations. <br /> ss sere SAMMY •ID'rriam's V <br /> SITE SAFETY OFFICER: Mike Ellis <br /> TITLE: Job Superintendent <br /> Duties include being responsible tor: <br /> A. Implementation of all K.E.Curtis Construction Co.Safety rulos and procedures. <br /> 8. Implementation of exposure monitoring itaeathing air). <br /> C. Proper barricading of the work zones for the purpose of protecting the public. <br /> D. Decontamination and contamination reduction procedures. <br /> E. the posting and implementation of the eme+gency action plan- <br /> F. Daily/weekly briefing of safety issues of hand. <br /> G. Inventory of needed safety equipment. <br /> :.A DOW N&ANAq AMALV X <br /> A. CHEMICAL HAZARDS-Possible major contaminants are: <br /> Low pub Sol- Vpr pressure Per cent <br /> ChVmicQ1 valve Routes of enlry W yf in mm Hg LELIUEL <br /> gasoline 300 ppm inglinh/con insol 40 4 68F 1.3/6.0 <br /> diesel 100 mg inglinh/con insol 1.9 640C 0.7/5.0 <br /> benzenes I ppm ing/inh/con .0007 75®68F 1.3/7.9 <br /> tolueno 100 ppm ing/abshrih/con .0005 20®65F 1.2/7.1 <br /> ethylbenzene 100 ppm ing/inh/Con .0001 10® 79F 1-0/6.7 <br /> xylene 2 ppm ing/abs/inh/con insal 9 Q 68F 1.117.0 <br /> B. POIENIIAL PHYSICAL HAZARDS (hi-lited) <br /> 1. PHYSICAL STRESSORS: Heal,cold,wind, light, heavy equipment rwise, <br /> precipitation. <br /> 2. PHYSICAL CONTACT: Slip, trip, fall.oveihead. moving equipmerhl, active <br /> utilities. <br />