Laserfiche WebLink
FINDINGS FOR SITE APPROVAL <br /> PA-1700051 <br /> TALBIR DHILLON/MJM ENGINEERING <br /> 1. The proposed use is consistent with the goals, policies, standards, and maps of the General Plan, any <br /> applicable Master Plan, Specific Plan, and Special Purpose Plan, and any other applicable plan <br /> adopted by the County. <br /> • Although the General Plan designation is R/L (Low Density Residential), the zoning is I-L <br /> (Limited Industrial) and the use type of Truck Sales and Services — Parking may be <br /> conditionally permitted in this zone.As such,the establishment,maintenance and operation <br /> of the use proposed in application PA-1700051 is a consistent use. There are no Master, <br /> Specific or Special Purpose Plans applicable to the project site. <br /> 2. Adequate utilities, roadway improvements, sanitation, water supply, drainage, and other necessary <br /> facilities have been provided, and the proposed improvements are properly related to existing and <br /> proposed roadways. <br /> • This finding can be made because adequate utilities,access roads,sanitation, drainage and <br /> other necessary facilities have been provided or are proposed. The Department of Public <br /> Works required a Technical Memorandum certifying that the proposed development will not <br /> degrade the level of service along adjacent roadways and/or intersections to unacceptable <br /> conditions. The Technical Memorandum was submitted and it found that the project as <br /> proposed would not result in a significant traffic impact under San Joaquin County <br /> guidelines and would not result in an appreciable safety impact. The Technical Memo <br /> recommended tapers at each driveway to accommodate truck turns, and installing a right- <br /> turn-only median in the EI Dorado Street driveway. These recommendations are included in <br /> the Conditions of Approval and, as a result, the necessary roadway facilities will be <br /> provided. <br /> The project will be supplied with water from California Water Service. The applicant has <br /> proposed an on-site septic system and stormwater retention pond. The Department of <br /> Public Works will require the developer to provide drainage facilities in accordance with the <br /> San Joaquin County Development Standards. As a result, all necessary facilities will be <br /> provided. <br /> 3. The site is physically suitable for the type of development and for the intensity of development. <br /> • This finding can be made because the 4.11-acre parcel is of adequate size and shape to <br /> accommodate the proposed truck parking facility and improvements,and all yards, building <br /> coverage, setbacks, parking areas, and other requirements of the Development Title. The <br /> Site Plan shows that there is sufficient area for parking and circulation in compliance with <br /> Standards of the Development Title. <br /> 4. Issuance of the permit will not be significantly detrimental to the public health, safety, or welfare, or be <br /> injurious to the property or improvements of adjacent properties. <br /> • This finding can be made because the Initial Study prepared for this project found no <br /> potentially significant environmental impacts. It was determined that any potentially <br /> significant impacts could be adequately addressed through conditions of approval. <br /> 5. The use is compatible with adjoining land uses. <br /> • This finding can be made because the proposed use will not interfere with nor alter the current <br /> land uses on adjoining properties. The subject parcel is adjacent to nonconforming <br /> residences to the south,in a commercial zone,and west, in an industrial zone,and is adjacent <br /> PA-1700051 - Findings 1 <br />