My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
INSTALL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:44:46 PM
Creation date
11/27/2019 9:04:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. ANCHORING <br /> a. For conditions requiring holddown straps, it is the responsibility of the tank <br /> owner or his technical representative to determine the quantity of holddown <br /> straps and the method of anchoring. <br /> b. If the tank is to be placed on a concrete slab, a minimum of 12" of <br /> approved bedding material must be installed between the slab and the tank <br /> bottom. <br /> C. The tank installer must install expansion joint material under each holddown <br /> strap and all straps must be evenly and properly tensioned. <br /> 10. FIELD INSTALLATION OF APPURTENANCES <br /> a. It is the responsibility of the tank installer to complete the required field <br /> installation of all appurtenances. <br /> b. Surface preparation: All surface areas to be field fiberglassed must be <br /> thoroughly sanded, cleaned, and dry. <br /> C. Resin and catalyst mixing: The ratio of resin to catalyst is 1 pint resin to <br /> 1/2 oz. catalyst. <br /> d. After mixing the components, the field fiberglassing task must be <br /> accomplished within 20 minutes. <br /> e. It is imperative ,that all air bubbles be worked out of resin-saturated <br /> fiberglass mat. <br /> 11 . INSTALLATION OF SECONDARY CONTAINMENT SUMPS OR STANDPIPES <br /> a. Set sump or standpipe onto sump mounting ring as shown in Figure 11. <br /> b. Attach sump or standpipe to sump mounting ring by first applying a single <br /> strip of 1 " wide masking tape around the joint. The masking tape <br /> eliminates voids and aids the fiberglassing operation. <br /> C. Apply 2 layers of 1-1/2 oz. x 4" wide fiberglass mat strips around the joint. <br /> Installation Instructions -6- Rev. 8/19/94 <br /> Trusco Tank Inc. . P.O. Box 11925 . Fresno, California 93775 . 209-264-4741 . Fax 209-237-3413 <br />
The URL can be used to link to this page
Your browser does not support the video tag.