My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
INSTALL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:44:46 PM
Creation date
11/27/2019 9:04:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6 <br /> SMITH <br /> INSTALLATION <br /> 1.6.1 Piping layout properly to prevent traps or 1/8-inch to 3/4-inch pea gravel). <br /> Advance planning of the piping sumps. 3. Compact backfill carefully over <br /> layout is essential.It will make ser- 2. The piping should be separated and around the piping system. <br /> vicing the system easier and can by a distance of at least four to (See Figure 1.6.1). When using <br /> reduce the quantities of material six inches (102-152 mm); the tamping equipment, take care <br /> required. pipe and trench wall should be to prevent vibration from driving <br /> 1. Using the shortest practical separated by at least six inches small stones into the pipe wall. <br /> route, run pipe in a single 052 mm).See Figure 1.6.3.For The amount of compaction and <br /> double-wall secondary contain- <br /> trench from the tanks to the ent piping installations, refer the type of soil determines the <br /> m <br /> dispensers and from the tanks mart Two, Section 3, Figure soil modulus. For example, pea <br /> to the vent risers. to Part <br /> for proper distances. gravel has a typical modulus of <br /> 2. Pipe should run parallel to the 2. 1,000 psi with no compaction, <br /> tanks and dispensers. Note: In all cases, the pipe while sand requires slight com- <br /> should be completely surround- paction (85% Proctor density) <br /> 3. Avoid piping across the tanks. ed with select backfill (sand or to achieve a modulus of 1,000 <br /> 1.6.2 Trenching and backfilling <br /> Proper construction of trenches is <br /> important. They should be wide <br /> and deep enough to accommodate <br /> the piping and backfill material. <br /> See Table 1.6.1 for recommended 0 O , O <br /> minimum burial depths. <br /> 1. Typically,all piping should slope 0 :'�' YES NO <br /> at least 1/8 inch (3 mm) per foot <br /> toward the tank. Support pipe Figure 1.6.1 Figure 1.6.2 <br /> TABLE 1.6.1 <br /> RECOMMENDED MINIMUM BURIAL DEPTHS BASED ON SOIL MODULUS OF 1,000 PSI OR HIGHER <br /> (Refer to ASTM D3839 or AWWA C950 for Method/Theory) <br /> Min.Amount of Sand <br /> Minimum or Pea Gravel above <br /> Pipe Size Surface Condition Burial Depth the top of the pipe <br /> (in.) .,,,:(mm) (in.) (mm) (in.) (mm) <br /> 2 51 Unpaved 17 432 12 305 <br /> Paved,min.4"(102 mm)asphalt 12 305 8 203 <br /> Paved,min.4"(102 mm)concrete 9 229 5 127 <br /> 3 76 Unpaved 20 508 14 356 <br /> Paved,min.4"(102 mm)asphalt 13 330 9 229 <br /> Paved,min.4"(102 mm)concrete 11 279 7 178 <br /> 4 102 Unpaved 20 508 14 356 <br /> Paved,min.4"(102 mm)asphalt 14 356 10 254 <br /> Paved,min.4"(102 mm)concrete 11 279 7 178 <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.