Laserfiche WebLink
fore, the wrenches must be and-down or side-to-side THREAD II secondary contain- <br /> placed 6" to 12" (152 to 305 motion.The movement must ment fittings for petroleum pro- <br /> mm) away from the joint to be sufficient to move the ducts, DS-7000 series adhesive is <br /> assure good joint make-up. joint being checked. No used to bond the joints. These <br /> NOTE: If T.A.B. wrenches are movement should be visible joints do not require heat-assisted <br /> in the joint.If any movement curing, but you can shorten the <br /> not available, strap wrenches, exists, continue to tighten cure time b applying heat. We <br /> such as Ridgid"'No.2-P,can be until no movement is visible.recommend external heat to <br /> used.To prevent damage to the assure full adhesive cure when <br /> pipe wall,wrap the strap wrench Connections into fittings are made ambient temperature is below <br /> around the pipe as shown in using the normal bell and spigot 70° F (21° Q. <br /> Figure 1 .6.15. CAUTION: methods. <br /> Improper use of strap wrenches It is desirable but not necessary for <br /> can cause point loading damage 1.6.5 Adhesive cure time the curing operation to imme- <br /> and/or bad joints that are not Cure time is the time required for diately follow the bonding opera- <br /> locked up. the adhesive in the assembled tion. However, it is preferable to <br /> In order to gain experience in joint to harden.Cure time depends bond only that amount of pipe and <br /> determining the proper amount on the type of adhesive and the fittings that can be cured during <br /> of torque to use, the following ambient temperature,as shown in the same day. <br /> procedure is recommended for the following chart (See Figure (')Tool Coil a registered trademark of the Ridge <br /> the first few joints. DO NOT 1.6.16). (2)Note:220/240 volt heating collars are available on <br /> OVERTIGHTEN. special order. <br /> IMPORTANT: When using RED <br /> a. Coverall machinedareason THREAD IIA pipe with RED <br /> the spigot and at least 1/2- THREAD II fittings and/or RED <br /> inch (13 mm) beyond the THREAD II secondary contain- ';;,, PINS <br /> last thread in the bell with ment fittings for alcohol and11 <br /> adhesive. alcohol-gasoline mixtures, you <br /> MUST use DS-8000 series adhe- <br /> b. Screw the pipe together by sive to bond the joints, and each <br /> hand,ensuring that the joint joint MUST be heat-cured using <br /> is not cross-threaded. Two- PIPE <br /> inch (51 mm)diameter pipe electric heating collars or chemi- <br /> can be hand tightened. To cal heat packs. Reusable heating <br /> ensure complete joint make- collars are energized by a 110/120 STRAP <br /> \ <br /> up for 3"and 4"(76 and 102 volt power source(2) (See Figure HANDLE <br /> 1.6.17). <br /> mm) diameter pipe, T.A.B. <br /> wrenches should be used. When using RED THREAD II or <br /> c. Check lock up by moving RED THREAD IIA pipe with RED Figure 1.6.15 <br /> free end of pipe in an up- THREAD II fittings and/or RED <br /> DS-7000 and DS-8000 Series <br /> Ambient Temperature vs.Time to Pressure <br /> Temperature(°F) Time(Hours) <br /> 55 24 <br /> 60 16 <br /> 65 11 <br /> 70 9 <br /> 75 412 <br /> 80 4 <br /> 85 3'h <br /> 90 3 <br /> 100 2'h <br /> 110 1 2 <br /> Figure 1.6.16 Figure 1.6.17 Figure 1.6.18 <br /> 14 <br />