My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
INSTALL_2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:44:46 PM
Creation date
11/27/2019 9:04:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2000
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST INSTALLATION INSPECTION RECORD <br /> FACILITY NAME: 041-l" ADDRESS: �/��`7 Lw <br /> FACILITY ID# "~J TANK# UL# TANK MODEL/MATERIAL• <br /> 7 ��f <br /> CAPACITY: PRODUCT: �- � ' _��LC R.E.H.S: <br /> A I <br /> P N ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 1 <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1 1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br /> 2. UST INSTALLATION PLANS APPROVED <br /> INITIAL INSPECTIONS <br /> ol w 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: SOAP: PSI: HRS/M©:_;J BRINE(LIQUID ANNULAR): OTHER: <br /> L VJ ✓ 4. PRIMARY TANK TEST: PSI: HRS/CN) 3 <br /> TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br /> PIPING INSPECTIONS <br /> /` t- w PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) S6/ (CCR 2636 (e)) <br /> j "S� G�• 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2636 (e)) <br /> Z Ca 8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (a) (4)) <br /> J �� �/ ✓ !� 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br /> 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br /> j `� ✓ S 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br /> �/ G.✓ ✓ I 12. PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (c)(1)) <br /> FINAL INSPECTION <br /> r �( 13. PERFORMANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (c) (2)) <br /> 14. PERFORMANCE TEST Of CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br /> l 15. PERFORMANCE TEST OF LINE LEAK DETECTION�L �' (CCR 2643 (c) (1)) <br /> ? S •,�/ 16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (g)) <br /> 17. BALL FLOAT VALVES INSTALLED <br /> / r r 18. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br /> 19. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br /> ✓ `f 20. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br /> 21. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br /> J 22. "C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br /> 23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED �f 2b� (CCR 2630-2636) <br /> ALL CONDITIONS MET; FACILITY PERMIT ISSUED v / (H+S CODE 25284) <br /> COMMENTS: <br /> EH23-006 9/95 <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.