Laserfiche WebLink
NEW UST INSTALLATION INSPECTION RECORD <br /> FACILITY NAME: 041-l" ADDRESS: �/��`7 Lw <br /> FACILITY ID# "~J TANK# UL# TANK MODEL/MATERIAL• <br /> 7 ��f <br /> CAPACITY: PRODUCT: �- � ' _��LC R.E.H.S: <br /> A I <br /> P N ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 1 <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1 1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br /> 2. UST INSTALLATION PLANS APPROVED <br /> INITIAL INSPECTIONS <br /> ol w 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: SOAP: PSI: HRS/M©:_;J BRINE(LIQUID ANNULAR): OTHER: <br /> L VJ ✓ 4. PRIMARY TANK TEST: PSI: HRS/CN) 3 <br /> TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br /> PIPING INSPECTIONS <br /> /` t- w PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) S6/ (CCR 2636 (e)) <br /> j "S� G�• 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2636 (e)) <br /> Z Ca 8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (a) (4)) <br /> J �� �/ ✓ !� 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br /> 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br /> j `� ✓ S 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br /> �/ G.✓ ✓ I 12. PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (c)(1)) <br /> FINAL INSPECTION <br /> r �( 13. PERFORMANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (c) (2)) <br /> 14. PERFORMANCE TEST Of CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br /> l 15. PERFORMANCE TEST OF LINE LEAK DETECTION�L �' (CCR 2643 (c) (1)) <br /> ? S •,�/ 16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (g)) <br /> 17. BALL FLOAT VALVES INSTALLED <br /> / r r 18. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br /> 19. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br /> ✓ `f 20. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br /> 21. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br /> J 22. "C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br /> 23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED �f 2b� (CCR 2630-2636) <br /> ALL CONDITIONS MET; FACILITY PERMIT ISSUED v / (H+S CODE 25284) <br /> COMMENTS: <br /> EH23-006 9/95 <br /> 10 <br />