Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department <br /> DIRECTOR <br /> r. �a ? 1868 East Hazelton Avenue \Donna Heran,REHS <br /> �< Stockton, California 95205-6232 PR GRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carr esco,REHS,RDI <br /> Kase <br /> q<iFaac�` Website: www.sjgov.org/ehd YF�eyREHS <br /> Phone: (209) 468-3420 Linda Tur ane,REHS <br /> Fax: (209) 464-0138 Rodney E trade,REHS <br /> Adrienne Ellsaesser, REHS <br /> March 17, 2014 <br /> Hung Thanh Tran and Mary Kieu Nguyen <br /> 6131 Pacific Avenue <br /> Stockton, CA 95207 <br /> Subject: Shell Service Station <br /> 6131 Pacific Avenue <br /> Stockton, CA 95207 <br /> The San Joaquin County Environmental Health Department (EHD) has received and reviewed <br /> Monitored Natural Attenuation Work Plan, dated 24 January 2014, and Groundwater Monitoring Report <br /> - Third and Fourth Quarters 2013, dated 15 January 2014, prepared and submitted by your consulting <br /> firm, Conestoga-Rovers ssooiates (CRA), on your behalf for the above-referenced site. <br /> In Monitored—Natural Attenuation Work Plan, CRA proposed utilization of some of the existing <br /> monitoring well network to monitor the effectiveness of natural attenuation for addressing the residual <br /> gasoline constituents in groundwater. CRA will monitor and sample the monitoring wells on a <br /> semiannual basis and continue the approved monitoring schedule program. In addition to the current <br /> analytical suite, groundwater samples will be analyzed for dissolved oxygen (DO), oxidation-reduction <br /> potential (ORP), alkalinity, nitrate, sulfate, methane, manganese, and ferrous iron, and carbon dioxide. <br /> CRA will report field activities, the acquired groundwater monitoring data, and their natural attenuation <br /> evaluation in a report of findings. <br /> The EHD concurs with the proposed scope of work presented by CRA. If the proposed evaluation of <br /> natural attenuation has favorable results, submit the findings in a Corrective Action Plan (CAP) for <br /> remediating impacted groundwater. <br /> In Groundwater Monitoring Report- Third and Fourth Quarters 2013, CRA proposed that monitor wells <br /> / W-17 and MW-18 be sampled on a semiannual basis with the other site wells during the second and <br /> fourth quarters. CRA proposes to begin the sampling during the second quarter of 2014. The EHD <br /> approves the proposed sampling schedule presented by CRA. In addition, data for vapor extraction well <br /> 45�$'�VM49L-6.Qwas omitted in the Groundwater Monitoring Report- Third and Fourth Quarters 2013 submit this <br /> if`V data in future monitoring reports. <br /> Please contact Angelica Sandoval Marin at (209) 468-2807 or amarin@sjcehd.com if you have any <br /> CoA /g questions. �. <br /> IWV'Y'� <br /> Slnc r ly, <br /> 1- <br /> Angelica . Marin, REHS Nuel C. Henderson, Jr., PG <br /> Senior Registered Environmental Health Specialist Engineering Geologist <br /> C: Mr. James L. L. Barton, PG, CRWQCB, 11020 Sun Center Drive, Suite 200, Rancho Cordova, California 95670 <br /> Perry Pineda, Shell Oil Products US, 20945 S. Wilmington Blvd., Carson, CA 90810-1093 <br /> Larry Silva, CRA, 19449 Riverside Drive#230, Sonoma, CA 94576. <br />