My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
3500 - Local Oversight Program
>
PR0545003
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 11:01:53 AM
Creation date
11/27/2019 10:59:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0545003
PE
3526
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
02
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IBRO <br /> FUGRO WEST, INC. 10 <br /> 1050 Melody Lane,Suite 160 <br /> Roseville,California 95678 <br /> Tel: (916)782-2110 <br /> August 30, 1994 FAX: (916)786-7830 <br /> Mr. Mike Collins <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 1601 East Hazelton Avenue <br /> Stockton, California 95201 <br /> Subject: interim Remediation Workpian <br /> Shell Service Station (WIC No. 204-7525-0104) <br /> 6131 Pacific Avenue, Stockton, California <br /> Dear Mr. Collins: <br /> Fugro West, Inc. (Fugro), on behalf of Shell Oil Company (Shell), is providing this Interim <br /> Remediation Workplan for the subject site (Figures 1 and 2). This workplan has been <br /> provided in response to San Joaquin County Public Health Services, Environmental <br /> • Health Division's (SJCPHS/EHD) letter dated July 7, 1994. The SJCPHS/EHD letter <br /> requests an interim clean-up workplan for groundwater. A separate-phase hydrocarbon <br /> removal skimmer was installed in MW-3 in January 1993. Separate-phase hydrocarbons <br /> have not been observed in MW-3 since April 28, 1993. <br /> SCOPE OF WORK <br /> Fugro proposes the following scope of work for interim clean up: <br /> • Purging MW-3 of 40 to 50 gallons of groundwater by pumping or bailing during <br /> each auarterly monitoring and sampling event. The total volume Of Water removed <br /> during each quarterly event will be dependent upon recharge into the well. <br /> Purging will be performed by Shell's sampling contractor, Blaine Tech Services, <br /> Inc. (Blaine Tech), of San Jose, California. <br /> • Disposal of purge water will be handled by Blaine Tech. <br /> • The extra purging will be documented in the quarterly reports. <br /> • <br /> 83410020 AWP <br /> A member of the Fugro group of companies with offices throughout the world <br />
The URL can be used to link to this page
Your browser does not support the video tag.