Laserfiche WebLink
Ed <br /> D. SITE SAFETY WORK PLAN <br /> t <br /> PERSONNEL <br /> #r« <br /> e mhe 's . Responsibility <br /> Tracy Schilling Site Coordinator <br /> r <br /> i Tracy Schilling Project Engineer <br /> -, Brian Garber Site Safety <br /> Officer <br /> Perimeter Establishment; <br /> Map/Sketch Attached? Yes <br /> ; . NX Nosite Secured? Yes_ <br /> Yes� Perimeter Identified? Yes__XX,_,,,•No_ Zero line defined? <br /> N <br /> _M Free Product. Yes No Dissolved <br /> Product? Yes No <br /> INVESTIGATION-DERIVED MATERIAL DISPOSAL: <br /> The total volume of cuttings removed from the soil borings is <br /> expected to be between one and two cubic yards. Material removed <br /> from the borings will be placed on and covered by visquene. Four <br /> point samples will be collected from the stockpiled soils and <br /> composited at the laboratory into t-o samples. One composite <br /> sample will be analyzed for STEX, TPH, and total lead according <br /> U to methods described in section 4.0. The remaining sample will be <br /> frozen and retained by the laboratory for further testing, if <br /> required. The stockpiled soil will be legally disposed of upon a <br /> confirmation of the contents fx•om the analytical soil sample <br /> results. <br /> i <br />