Laserfiche WebLink
10 <br /> CROSS SECTION B-B' [�CALE <br /> CONSTRUCTION DETAIL Horizontal Is 15' <br /> Vartical I to, <br /> Concrete Pad <br /> eVertical Riser, Extend 0 15 <br /> AboI:167As Required Fuel Island <br /> V -1 VE 1-2 <br /> 11:5,111 Horizontal Vapor <br /> Extraction PlpinW. <br /> In- Old-Prod uc <br /> See Detail A Una-Trench <br /> Original I <br /> Tank Basin 1 <br /> ---------- <br /> DETAIL A <br /> MANIFOLD DETAIL <br /> Not DrawnTo Scale <br /> Concrete Slab <br /> New <br /> P pr <br /> reduct <br /> L Lir <br /> ines <br /> tClsan <br /> Native Soil <br /> Fill <br /> Material <br /> Vapor <br /> Extraction <br /> 4 <br /> siI _--Manifold <br /> PVC N PVC Pipe <br /> Slotted Only In <br /> old PlpIng <br /> 6" Trench Trench Area <br /> Y, <br /> 6131.Pacific Ave, Stocktc6l, CA. <br /> Aegis Project,No. 90-020 <br /> Pago! 29 <br /> 6� <br /> FIGURE 10 <br /> PROPOSED VAPOR EXTRACTION WELLS <br /> AND MtqNIFOLD SYSTEM <br /> Shall Service Station <br /> 61SI Pacific Avenife <br /> Stocklon� Co. <br /> - 020 <br /> go <br /> AEGIS job N a <br /> DRAWN By: Ed Bemard DATE. June 16,1M <br /> REVIEWED Wt. DATE: <br />