Laserfiche WebLink
i <br /> � CAMBRIA <br /> wells MW-6, MW-10, and MW-1I are primarily caused by chlorinated compounds It should be <br /> noted that these compounds were not identified in any onsite wells, suggesting that the TPI-Ig <br /> identified in these wells did not originate at the subject site <br /> RECOMMENDATIONS <br /> Equilon Enterprises LLC is currently pursuing an access agreement with a neighboring property <br /> owner to install proposed wells MW-8 and MW-9 across Pacific Avenue as shown on Figure 2 <br /> Upon receiving this agreement, Cambria will obtain the necessary permit from SJCPHS/EHD <br /> N <br /> and schedule a driller to install proposed offsite monitoring wells MW-8 and MW-9 <br /> As discussed above, Cambria will investigate the status of the two domestic wells identified <br /> downgradient of the site <br /> Cambria also recommends gauging and sampling wells MW-1 through MW-7, MW-10, MW-11, <br /> and VEW-2 quarterly Groundwater samples from the wells will be analyzed for TPHg, BTEX, <br /> and MTBE quarterly and for the fuel oxygenates ETBE, TBA, DIPE, and TAME annually in the <br /> third quarter according to the existing sampling schedule <br /> If you have any questions regarding the contents of this document, please call Aubrey Cool at <br /> (707) 933-2368 <br /> Sincerely, <br /> Ca ria Environmental Technology, Inc. <br /> Scott Its\ <br /> Staff Geologist <br /> O�`' W E �O <br /> Joe W Neely,RG O�Q FF`C�s�, <br /> Senior Project Geologist -� <br /> RG 6927 a No 6927 <br /> 'kOF Ct4fto <br /> 1p- <br /> 0854 9 <br />