My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006799
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
3500 - Local Oversight Program
>
PR0545003
>
ARCHIVED REPORTS_XR0006799
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 11:42:41 AM
Creation date
11/27/2019 11:05:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006799
RECORD_ID
PR0545003
PE
3526
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
02
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> concentrations of 660 and 220 ppb MTB—/was detected in well MW-4 b 1Ly � <br /> Metl+ed—b at a concentration of 51 6 ppb a� u , .C)c) ice► u,-.XX AW)-� <br /> Quarterly Sampling <br /> Groundwater samples were analyzed for total purgeable hydrocarbons as gasoline (TPHg) by <br /> EPA Method 8015 (Modified) and benzene, toluene, ethylbenzene, xylenes (BTEX), and <br /> methyl tertiary butyl ether (MTBE) by EPA Method 8020 Groundwater samples collected <br /> from wells MW-4 and MW-7 were also analyzed for MTBE by EPA Method 8260A <br /> Field monitoring data and chemical analytical data are presented in a summary table in <br /> Blaine's groundwater monitoring report (Appendix A) <br /> Conclusions <br /> Groundwater samples collected from the wells this quarter contained concentrations of <br /> petroleum hydrocarbons and MTBE consistent with historical ranges for this site <br /> • Closing <br /> Cambria submitted a work plan to SJCP14S on January 31, 1999 for further investigation at <br /> this site S3CPHS approved this work plan and we are pursuing access agreements and <br /> encroachment permits for the proposed off site monitoring wells The two proposed onsite <br /> soil borings are tentatively scheduled to be drilled May 23 and 24, 2000 <br /> Quarterly monitoring and sampling will continue on the established schedule for this site <br /> 0854 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.