Laserfiche WebLink
EQU A WELL MONITORING DAi-_ SHEET , <br /> Project # Job # <br /> D� 2427s Dia <br /> Sampler Date <br /> Well I D Well Diameter- - 3 4 6 S <br /> Total Well Depth C, Depth to Water <br /> Depth to.Free_Product__,. Thickness of Free Product (feet) <br /> Referenced to VC Grade T DO Meter (if req'd)- YS1 HACH <br /> TWeil mct Multiolier Weil diameter muftioiter <br /> 016 S 102 <br /> 037 <br /> a- 065 Othe- radius'•0 163 <br /> Puree Methodter Sampling Method ailer <br /> Middleburg Extraction P <br /> nort <br /> Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> X = Gats <br /> 1 Case Volume (Gals } Specified Volumes Calculate Volume <br /> Time Temp (°F) pH Cond Turbidlry Gals Removed Observations <br /> Did well dewater) Yes Gallons actually evacuated <br /> Sampling Time Sampling Date: s� <br /> Sarnvle I D Laboratory ata BC tithe, <br /> Analyzed for- TPH-G BTEX MTB TPH-D Other Y co <br /> M. 'ng+ <br /> DO (if req'd) Pre-purge '/r_ Post-purge IL <br /> - <br /> 0 R P (if req'd) Pre-purge my Post-purge mV <br />