My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006820
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
3500 - Local Oversight Program
>
PR0545003
>
ARCHIVED REPORTS_XR0006820
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 11:42:36 AM
Creation date
11/27/2019 11:10:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006820
RECORD_ID
PR0545003
PE
3526
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
02
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMBRIA <br /> collected at the conclusion of the DPE test on the well June 25, 2004 The sample contained <br /> 150,000 ppb TPHg and 6,200 ppb benzene MTBE was not detected in the sample at an elevated <br /> reporting lint of 200 ppb <br /> SVE from well VEW-1 began at 8 45 on June 24 Applied vacuum readings were measured at the <br /> wellhead Extraction flow rates were measured after the moisture separator An initial wellhead <br /> vacuum of 36 inches WC resulted from a liquid-nng pump-generated vacuum of 68 inches of <br /> mercury-gauge (Hg) The maximum wellhead vacuum achieved was 119 7 inches WC The vapor <br /> extraction flow rate ranged from 61 1 to 138 7 sctm and averaged 112 1 scfm Cambria personnel <br /> observed a maximum vacuum influence of 5 0 inches WC in observation well VEW-2 Extraction <br /> well VEW-1 was dry, therefore, groundwater was not extracted <br /> The vapor sample collected from VEW-1 at 10 05 contained 730 ppmv TPHg, 2 0 ppmv MTBE, <br /> and was below the reporting hmit (¢1 6 ppmv) for benzene The vapor sample collected at the end <br /> of the day (13 00) contained 1,400 ppmv TPHg, <3 1 ppmv benzene, and 2 5 ppmv MTBE The <br /> Solleco unit was set to operate overnight to maximize the remedial ettort <br /> . June 25, 2004 SVE from well VEW-1 continued until 11 00 An average wellhead vacuum of <br /> 109 1 inches WC was established by a liquid-ring pump generated vacuum of approximately <br /> 204 inches Hg The vapor extraction flow rate ranged from 111 2 to 133 2 sctm and averaged <br /> 123 1 sctm. The sample collected at the conclusion of interim remediation (11 00) contained <br /> 860 ppmv TPHg, [0 31 ppmv benzene, and 1 1 ppmv MTBE Cambria personnel observed a <br /> maximum vacuum influence of 6 3 inches WC in observation well VEW-2 <br /> Estimated Radius of Influence <br /> Wells VEW-1 and VEW-2 were used to measure vacuum influence or alternatively as extraction <br /> points Well MW-5 was also used to measure vacuum influence while extracting from wells <br /> VEW-1 and VEW-2 Wells VEW-I and VEW-2 are located approximately 25 feet apart When <br /> vacuum was applied to well VEW-1, a maximum vacuum of 6 3 inches WC was observed in well <br /> VEW-2 When vacuum was applied to well VEW-2, a maximum vacuum of 1 1 and 0 1 inches <br /> WC was observed in wells VEW-1 and MW-5, respectively Wells VEW-1 and VEW-2 are not <br /> screened it sirrular depths below grade, VEW-1 is screened from 5 to 20 fbg and VEW-2 is <br /> screened from 20 to 45 fbg A preferential pathway between the two wells may be present based <br /> on the induced vacuum observations during the DPE test, and may be attributed to the proximity of <br /> the wells to the former UST backfill <br /> 0854 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.