Laserfiche WebLink
PROJECT NAME/LOCATION: PROJECT BORING <br /> E NUMBER: 90-020 NUMBER: VE-2 SHEET 2 OF 2 <br /> Shell Service Station <br /> 6131 Pacific CONTRACTOR: DRILLING <br /> Stockton, CA West Hazmat Drilling METHOD. 10" HSA <br /> ' DRILLER: r DRILLING RIG: <br /> Gene Reinhardt Diesel Acker AD-2 <br /> LAND OWNER: START DATE: 07-12-90 COMPLETED: 07-12-90 <br /> Shell Oil Company TIME: 4 : 30PM TIME: <br /> S T S N B C S I D <br /> A Y A U L O A N E GENERAL <br /> M P M M 0 U M T P DESCRIPTION OF MATERIALS PID OBSERVATION <br /> 1 P E P B W N P V T AND CONDITIONS (ppm) NOTES <br /> L L E T L A H <br /> E E R S E L (FT) Surface: 3" Asphalt <br /> 2 . 0 VE2 35 Sandy SILT: olive brown, moist, 0000 Strong gas <br /> CA fine to medium grained, sand, odor <br /> { SS (ML) <br /> I <br /> SS 40 Sandy SILT: fine 000 Strong gas <br /> ' grained, olive brown, saturated odor <br /> f with gasoline, (ML) <br /> SS 45 Sandy SILT: fine <br /> grained, olive brown, 0000 Strong gas <br /> saturated with gasoline, (ML) odor <br /> ------------------------------- <br /> TOTAL DEPTH 47 FT. <br /> SS 50 <br /> SS 55 <br /> SS 60 <br /> SS 65 <br /> Field Notes: <br /> Aegis <br /> -Soil boring completed as 4" diameter PVC Environmental <br /> vapor extraction well Inc. <br /> -Not sampled due to location and previous <br /> descriptor during tank removal <br /> Logged By: Abel Ramirez <br />