Laserfiche WebLink
GEOPROBE CONSTRUCTION DETAIL GRAPHIC DESCRIPTION <br /> PID Blow <br /> (ppmv) Counts <br /> 24 24 <br /> 5 SILT medium suR brown mast,no odor <br /> 26 26 <br /> 28 2810 <br /> 30 30 <br /> w <br /> 0 00 <br /> LLI 32 32 <br /> � <br /> 34 34 <br /> ML <br /> 5 0 SILT. medium stiff,brown mast,no odor <br /> °C <br /> 036 36 <br /> o <br /> m 38 38 00 <br /> CL <br /> 40 40 <br /> o <br /> o <br /> 42 42 <br /> 44 44 <br /> $ SILT with tine sand medium stiff bluish grey, <br /> 46 46 moist.no odor <br /> 48 II 48 <br /> � rlrErlef �l� <br /> Inch Radius 0 2 4 6 <br /> Explanation contam GeoProbe 3 <br /> Water level in completed wail Solid where certain <br /> Q First water found during dnlhrg Dotted where approximate Shelf Service Station WIC#204-7525-0104 Page <br /> 6131 Pacific Avenue 2 of 3 <br /> Location of racrnrared drill sam^la — — Dashed where ur=rts n Stocidon,CA <br /> - <br /> Wail Nurnllef <br /> Location of sample sealed for e///� Hachured where gradational omm By <br /> chemical analysis rulm Q J Paradrs <br /> am K Estimated permeability DW Geo-3 <br /> ® Sieve sarnple (hydraukc conductivity) October 25 1995 <br /> amRW"M a er <br /> 1K-primary 2K-secondary J Paradrs <br /> Continuous Core <br /> ® Job Number <br /> f10 Ra°Ye^1 ° �� November S 1996 93-47-0020 <br />