My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007405
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
3500 - Local Oversight Program
>
PR0545003
>
ARCHIVED REPORTS_XR0007405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 11:32:20 AM
Creation date
11/27/2019 11:17:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007405
RECORD_ID
PR0545003
PE
3526
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
02
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AEGIS ENVIRONMENTAL , INC w <br /> 1050 Melody Lane, Suite 160, Roseville, CA 95678 + 916.782-21101916.969-2110 I FAX 916.786-7830 <br /> March 29, 1993 - <br /> Ms Merylene Marengo Arsanis <br /> 6024 Pacific Avenue <br /> Stockton, California 95207 <br /> Subject Parking Area at J. Marengo Center I d <br /> Stockton, California <br /> Dear Ms Arsanis <br /> The San Joaquin County Department of Environmental Health has requested that Shell <br /> Oil Company (Shell) investigate soil and groundwater conditions in the vicinity of the Shell <br /> service station located at 6131 Pacific Avenue in Stockton <br /> In response to the agency's request, Aegis Environmental, Inc (Aegis), on behalf of Shell, <br /> requests permission (right of entry) to drill and install a groundwater monitoring well in the <br /> parking area of the subject site <br /> The location of the proposed groundwater monitoring well is shown on Figure 1 The well <br /> would be drilled and installed to about 65 feet below the surface using a truck-mounted <br /> drilling rig Drilling and installation of the well would take approximately 5 hours The <br /> finished wellhead would be covered by an unobtrusive, 12-inch-diameter, traffic-rated <br /> metal enclosure mounted flush with the asphalt paving Three similar groundwater <br /> monitoring wells are currently located at the Shell site Following installation, groundwater <br /> cor-nniec 0A he nnlinn+nrl frown +ha %Rrali n+ 1ntervaie <br /> �J4 i OWIVJ TV VL I%A y4 VV114 VLy LJ 11 VI I I U 1y •1411 CAL VI 1 1%..01MGIJ <br /> Every effort will be made to expedite the fieldwork and minimize any inconvenience to the <br /> retail tenants Aegis has enclosed a right-of-entry agreement for your review and <br /> signature Please make a copy of the agreement for your use and forward the original <br /> to Aegis <br /> 90-020X LTR <br /> GEOLOGISTS - ENGINEERS - GROUNDWATER SCIENTISTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.