Laserfiche WebLink
GEOPROBE CONSTRUCTION DETAIL GRAPHIC DESCRIPTION <br /> PID ohm LM <br /> (ppmv) Counts <br /> 24 24 <br /> 40 <br /> 26 26 SILT sti[f,brawn,damp,no oda <br /> 28 28 <br /> 30 30 14 <br /> SILT stiff.brown,damp no oda <br /> Lf_ <br /> Lu 32 32 <br /> 0 34 34 <br /> z <br /> 3750slightoda <br /> 36 36 <br /> I lip IVL' 00 <br /> m 38 38 <br /> • 40 40 <br /> 23ostiff,sandy SILT medium s ,brown,mast,no odor <br /> 42 42 <br /> 44 44 <br /> 46 46 215 SILT stiff,brown,mast.slight oda <br /> 48 48 <br /> is 0 000 0 o.0 SILT medium stiff,brawn,wez.slight odor <br /> 50 50 Tates Depth-so feet <br /> I � f � fr_� tl � lrl <br /> Inch Radius 0 2 4 8 <br /> EVIanatlon Contaefa <br /> GeoProbe 2 <br /> Water level In completed well Solidwharcwrmn <br /> e <br /> First water found during drilling .... Dotted where approximate Sheli Some Station WIC#204-7525-0104 Page <br /> 8131 Paclft Avenue 2 of 2 <br /> ® Location of recovered drill sample — Dashed where uncertaut Stoddon,CA <br /> - <br /> well Nuntb <br /> Location of sample sealed for f!!!i }lactured where gradahonai ey <br /> er <br /> chemical analysesGnuJ Paradiis <br /> ass K EWmated pK��y D&W oclobar zs 1906Geo-2 <br /> ® Sieve scruple (hydraulic conduenvay) <br /> MW <br /> IK—primary 2K-secondary EV J Parade <br /> ® Continuous Cor. moi. Job Number <br /> NR No Recovery _ — DAW wvember s i sos 93-47-0020 <br />