Laserfiche WebLink
NN j�;LL MONITORING DATA SHEET <br /> Project #- ` _ Client I <br /> 01 Sampler Start Date <br /> 1 b <br /> Well I D Well Diameter © 3 4 6 8 <br /> Total Well Depth .� Depth to Water 31 <br /> Before After: Before- After <br /> Depth to Free Product Thickness of Free Product (feet). <br /> Referenced to. Grade IDO Meter (if req'd) Ysl HACH <br /> Purge Method Sampling Method Bailer <br /> Bader Waterra Disposable Bailer <br /> Disposable Bailer Peristaltic Extraction Port <br /> Middleburg Extraction Pump Dedicated Tubing <br /> Electric Submersible Other Other <br /> Well Diameter Multiplier Well Diameter Multi ]ter <br /> _ 1" 004 4" 065 <br /> S +S (Gals)X = C2 Gals 2" 016 6" 147 <br /> 1 Case Volume S ectfied Volumes Calculated Volume 3" 037 Other radius+0 163 <br /> Time Temp (°F) pH Cond Turbidity Gals Removed Observations <br /> -7 . 0 1Z1 <br /> �3 _':21 2 "in -_I C_ L�V4 <br /> 112 4 V o 7 ZE? o t <br /> w 1 .7 . 6 <br /> CO- Lu t <br /> Did well dewater? Yes 0 Gallons actually evacuated Q <br /> Sampling Time: Sampling Date <br /> 3- lb-n 1 <br /> Sample I D <br /> P ,. Laboratory , <br /> amaly�ed �r: � ivl >s>~ %rri-li Other <br /> Equipment Blank I D @ Tme Duplicate I D - <br /> Analyzed for TPH-G BTEX MTBE TPH-D Other <br /> DO (1f req'd)- Pre-purge m$/L Past-purge mg/L <br /> RP (if req'd). Pre-purge mV Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />