My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_1998 - 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:36:34 PM
Creation date
11/27/2019 1:15:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 1999
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> DROP TUBE CHECK SHEET INSTRUCTIONS <br /> S. S. # 62567000276 <br /> 1.) Remove tight fill cap, look down tube, and check for following: <br /> a.) Loose or damaged deflector. No <br /> b.) Flapper hanging out past deflector. No <br /> 2.) Pull out drop tube and check for the following: <br /> For OPW 61-SO: <br /> a.) Float pivots freely and resets at approx. 30 degree angle from vertical when <br /> at rest. Float does not hang up in any position. Yes <br /> b.) Deflector rivets are intact. Rivets must be stainless steel as supplied. Yes <br /> c.) Three (3) screws are properly installed and aluminum tube and screw heads are <br /> not damaged nor cracked. Yes <br /> d.) Look down drop tube while float is pivoted to see if flapper moves into tube properly <br /> and resets behind deflector. Yes <br /> For EMCO Wheaton: <br /> a.) Deflector rivets are intact. <br /> b.) Three (3) screws are properly installed and aluminum tube around screw heads are <br /> not damaged nor cracked. <br /> c.) Aluminum sheathing around mechanism is not dented. <br /> d.) Space behind deflector plate is free of wood chips, debris, etc. <br /> FOR STRAIGHT DROP TUBES (CHECK ONE) <br /> 1.) 4" STRAIGHT DROP TUBE <br /> 2.) 4"STRAIGHT COAXIAL DROP TUBE <br /> 3.) 3" STRAIGHT DROP TUBE <br /> 4.) 3" STRAIGHT COAXIAL DROP TUBE <br />
The URL can be used to link to this page
Your browser does not support the video tag.