My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_1986 - 1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:43:50 PM
Creation date
11/27/2019 1:44:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1997
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANRNOLOGY CORPORATION INTERNATIONAL <br /> 10700 JERSEY BLVD. , SUITE 170 <br /> RANCHO CUCAMONGA, CALIFORNIA 91730 <br /> (714) 941-4491 — FAX (714) 941-7215 <br /> IMPACT VALVE TEST REPORT <br /> LOCATION: —re,�-c� Ol L CC) SERVICE STATION NO. : ,Zt Oz-74P <br /> L1g6 it) 6o4A C �TEST DATE: 4— 3-� <br /> COUNTY: TECHNICIAN: bf <br /> Corrected <br /> Yes No Date <br /> IMPACT VALVES <br /> v <br /> 1. Are remote pumping systems used? <br /> 2 . Are impact valves with fusible <br /> links installed under all X,� <br /> dispensers? <br /> 3 . Are the impact valve shear lines <br /> within ± 1/2" of the top of the <br /> PUMP block? �` <br /> 4 . Are the impact valves secured p►�� <br /> to the pump island? <br /> r� <br /> 5 . Does the impact valve open and <br /> close easily? <br /> i <br /> 6. Is the area immediately around <br /> the impact valve linkage clear <br /> of dirt, sand or gravel? <br /> 7 . Is each impact valve free of <br /> any device that may prevent 1 / <br /> its proper operation? <br /> 8 . Does the impact valve stop all <br /> product flow when closed? <br /> 9 . Are there any visible leaks, 7�f <br /> weeps or sweating joints at <br /> the impact valve? V <br /> 10. Is the dealer satisfied that <br /> all of the impact valves are <br /> operating properly? <br /> Remarks: <br /> SMG/smp/3-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.