My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_1986 - 1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:43:50 PM
Creation date
11/27/2019 1:44:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1997
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! I <br /> 14. <br /> Name of Supplier.Owner or Dealer Address No.and Streets) City State Date of Test <br /> 15. TANK TO TEST 16. CAPACITY From <br /> / Station Chart <br /> ram / !� s�,rl By most accurate 9g <br /> M Nominal Capacity Oi CC/�CCJJ capacity chart available C/ Tank Manufacturer's Chart <br /> rnIdI by position Gallons Gallons <br /> —r O en Company Engineering Data - <br /> m <br /> ;0 /O Is there doubt as to True Capacity? E Charts supplied with petro TI� <br /> ran, zan <br /> C Brand and Grade See Section"DETERMINING TANK CAPACITY" ❑ Other <br /> 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to Ye in. Gallons ea.Reading <br /> Stick Water Bottom 9 <br /> before Fill-up _ Inventory 9 <br /> to% In. Gallons <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> s <br /> Tank Diameter Product in full tank(up to fill pipe) _ n <br /> IV <br /> °.008 <br /> w 0 0 0 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK 6,3S �'�''> JC' VAPOR RECOVERY SYSTEM <br /> g x <br /> 1 00> See manual sections applicable.Check below and record procedure in log(26). J CC r Stage I <br /> g Y O m Water In tank High water table in tank excavation i )being tested with LVLLT Slagle 11 <br /> C 21. TEMPERATURE/VOLUME FACTOR (a) TO TEST THIS TANK ` <br /> 14 <br /> 19. TANK MEASUREMENTS FOR <br /> to TSTT ASSEMBLY Is Today Warmer?i I Colder?I I °F Product in Tank_°F Fill-up Produc!oh Luck_°F Expected Change( + or - ) <br /> Bottom of tank to Grade*.................... � (�� j� ��1, <br /> m 22. Thermal-Sensor reading after circulation _..._ F <br /> Add 30"for 4"L ................. _ gds Nearest <br /> Add 24"for 3"L or air seal ....... _ 23. Digits per°F in range of expected change—. <br /> Total tubing to assemble Approximate digits <br /> 24. / 1J X i- ")L�l,1 5-'= !. �./('7/ /�(1� '} gallons <br /> ....................... <br /> EXTENSION HOSE SETTING total quantity in coefficient of expansion for volume change in this tank <br /> Tank top to grade'....... .... full tank(16 or 17) involved product per°F <br /> Extend hose on suction tube 6"or more - <br /> below tank[op ..................................... — 25. ) — `„>,1. �:/ — r �-�y This is <br /> volume change per°F(24) Digits per`F in test Volume change per digit.^ test <br /> 'If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26. 30. HYDROSTATIC 31. 34. 38.NET vo(uidE- 39. <br /> VOLUME MEASUREMENTS(Y) TEMPERATURE CONPENSATION ACCUMULATED, <br /> LOG OF TEST PROCEDURES PRESSURE RECORD TO.fMl GAL. USE FACTOR(a) CHANGES CHANGE <br /> CONTROL EACH REAPING A_ <br /> 27. 28. 29. Standpipe Level 32, 35. 36. 37. Temperature At Nita Laval recerd <br /> NATE Record details of settingu Product a Product Adjustment f <br /> in Inches Change Computation I Total Ey 0elNctiee (J <br /> l Reading Graduate Replaced(—) Thermal Higher+ (c) x (s)- Volu <br /> and running test.(Use full No. pre�++AJ,(, <br /> Beginning Level to Sensor Lower— Expansion+ Exp 1J,(, At Lor Level taapeu <br /> length of line if needed.) of which Befon Aher Product Raclin Contraction— Change per Now <br /> TIME g (c) CoNtaai n <br /> (ZA it 1 // / Reading Restored Reading Reading Recovered(+) a 33(V) i'�.(NFPA crmria) <br />
The URL can be used to link to this page
Your browser does not support the video tag.