My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
COMPLIANCE INFO_1986 - 1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:43:50 PM
Creation date
11/27/2019 1:44:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1997
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> RETROFIT LOCATIONS <br /> INVENTORY RECONCILIATION - Performed daily by facility operators. <br /> Variations in excess of 100 gallons daily, 5% of thruput but no <br /> greater than 350 gallons weekly and 0 .5% of thruput but no less <br /> than 100 gallons monthly will be reported. To improve inventory <br /> reconciliation accuracy, Texaco is installing automatic continuous <br /> tank gauging instrumentation for each tank (Veeder-Root TLS-250/ <br /> literature attached) . Results of inventory reconciliation will <br /> be reported to administering agency quarterly. <br /> TANK TESTING - Tank testing will be performed quarterly by automatic <br /> tank gauging system' s leak detect mode which detects leaks to an <br /> accuracy of 0 .20 gallons per hour (at 24-hour locations , tanks <br /> will be taken out of service for 6 hours per quarter to run this <br /> test) . Results of tank tests will be reported to administering <br /> �GT-� agency quarterly. <br /> LINE PRESSURE MONITORING SYSTEM - In addition to Red Jacket leak <br /> detectors , pressurized product lines will be continuously moni- <br /> tored by electronic line pressure monitor (K & E Associates <br /> PMS-800/literature attached) which will disable submersible pumps <br /> upon pressure drop in line corresponding to a leak of 0 .05 gallons <br /> per hour. <br /> SPILL CONTAINMENT BOX - Spill containment boxes will be installed <br /> on all fill lines regardless of groundwater depth. <br /> WASTE OIL TANKS - All waste oil tanks will either be removed or <br /> replaced with double wall tanks. Sensors (K & E) will be in- <br /> stalled in the annular space of each replacement tank to contin- <br /> uously monitor for leakage. <br /> We feel that this proposed method of compliance fully meets the <br /> intent of new regulations established to protect our environment. <br /> A significant advantage of this system is that we will be able to <br /> detect leakage almost immediately, whereas other methods of leak <br /> detection such as relying on precision testing or groundwater <br /> wells can allow substantial undetected leakage. <br /> BCN:dc <br /> R211/54X/1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.