Laserfiche WebLink
• r <br /> TEXACO SELF-SERVE FACILITY <br /> 440 WEST CHARTER WAY <br /> STOCKTON, CA. <br /> INFORMATION REQUESTED <br /> UNDERGROUND STORAGE TANK PLAN REQUIREMENTS: <br /> B. TANK SPECIFICATION: <br /> 1. (2) -10, 000 GAL. & (1) - 12, 000 GAL. SEE SHEET A-1 & P-1 <br /> 2. FIBERGLASS. SEE SHEET P-3 & P-4 <br /> 3. PRODUCT DESIGNATION SEE SHEET A-1 OR P-1 <br /> MONTHLY THROUGHPUT: 150, 000 GALLONS. (ALL TANKS) <br /> 4 . SEE DETAIL ON SHEET P-3 FOR MONITORING SYSTEM <br /> 5. CONCRETE YARD & DRIVE SLABS SHALL BE REINFORCED <br /> WITH #3 RE-BAR AT 24" O.C . BOTH WAYS. SLABS <br /> SHALL BE 6" THICK WITH A 6" GRAVEL BASE. <br /> TANKS TO BE BACKFILLED WITH PEA GRAVEL. SEE SHEET P-3 <br /> C. PIPING AND EQUIPMENT <br /> 1. PHASE I VAPOR RECOVERY SYSTEM INFORMATION <br /> (a) SEE (b) & (c) <br /> (b) FILL ADAPTOR: CNI 615B, VAPOR ADAPTER: CNI-611-DB-3A <br /> (c) FILL CAP TYPE : CNI 32 , VAPOR CAP : CNI-611-VR-3 <br /> (d) DISTANCE BETWEEN FILL PIPE AND BOTTOM OF TANK: 6" <br /> (e) N/A <br /> 2. PHASE II VAPOR RECOVERY SYSTEM INFORMATION <br /> (a) BALANCE <br /> (b) 30 NOZZLES, MAKE: EMCO WHEATON A3005 <br /> (c) EMCO-WHEATON A-4110-001 <br /> (d) OVERHEAD HOSE RETRACTOR: CNI 6 ' -6" HIGH <br /> (e) 2" FIBERGLASS PRODUCT & VAPOR LINES <br /> (f) SLOPE VAPOR LINE 1/8"/1 '-0" TOWARD TANKS <br /> (g) 12 ' -6" LONG, 14" DIA. <br /> (h) N/A <br /> (i) TOKHEIM MPD 330A CONFIGURATION <br /> D'3 <br /> 1 � <br />