My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1984
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
440
>
2300 - Underground Storage Tank Program
>
PR0231055
>
INSTALL_1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 3:40:52 PM
Creation date
11/27/2019 2:43:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1984
RECORD_ID
PR0231055
PE
2361
FACILITY_ID
FA0002321
FACILITY_NAME
Delta arco
STREET_NUMBER
440
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16503003
CURRENT_STATUS
01
SITE_LOCATION
440 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• r <br /> TEXACO SELF-SERVE FACILITY <br /> 440 WEST CHARTER WAY <br /> STOCKTON, CA. <br /> INFORMATION REQUESTED <br /> UNDERGROUND STORAGE TANK PLAN REQUIREMENTS: <br /> B. TANK SPECIFICATION: <br /> 1. (2) -10, 000 GAL. & (1) - 12, 000 GAL. SEE SHEET A-1 & P-1 <br /> 2. FIBERGLASS. SEE SHEET P-3 & P-4 <br /> 3. PRODUCT DESIGNATION SEE SHEET A-1 OR P-1 <br /> MONTHLY THROUGHPUT: 150, 000 GALLONS. (ALL TANKS) <br /> 4 . SEE DETAIL ON SHEET P-3 FOR MONITORING SYSTEM <br /> 5. CONCRETE YARD & DRIVE SLABS SHALL BE REINFORCED <br /> WITH #3 RE-BAR AT 24" O.C . BOTH WAYS. SLABS <br /> SHALL BE 6" THICK WITH A 6" GRAVEL BASE. <br /> TANKS TO BE BACKFILLED WITH PEA GRAVEL. SEE SHEET P-3 <br /> C. PIPING AND EQUIPMENT <br /> 1. PHASE I VAPOR RECOVERY SYSTEM INFORMATION <br /> (a) SEE (b) & (c) <br /> (b) FILL ADAPTOR: CNI 615B, VAPOR ADAPTER: CNI-611-DB-3A <br /> (c) FILL CAP TYPE : CNI 32 , VAPOR CAP : CNI-611-VR-3 <br /> (d) DISTANCE BETWEEN FILL PIPE AND BOTTOM OF TANK: 6" <br /> (e) N/A <br /> 2. PHASE II VAPOR RECOVERY SYSTEM INFORMATION <br /> (a) BALANCE <br /> (b) 30 NOZZLES, MAKE: EMCO WHEATON A3005 <br /> (c) EMCO-WHEATON A-4110-001 <br /> (d) OVERHEAD HOSE RETRACTOR: CNI 6 ' -6" HIGH <br /> (e) 2" FIBERGLASS PRODUCT & VAPOR LINES <br /> (f) SLOPE VAPOR LINE 1/8"/1 '-0" TOWARD TANKS <br /> (g) 12 ' -6" LONG, 14" DIA. <br /> (h) N/A <br /> (i) TOKHEIM MPD 330A CONFIGURATION <br /> D'3 <br /> 1 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.