Laserfiche WebLink
• U?' - <br /> San Joaquin County, April 17, 1997 <br /> Ms.Mary Meays -.2- 953-7001 <br /> permit,pressure grouting the wells in accordance with the guidelines set forth in Section 6, <br /> of the Well Standards established by San Joaquin County,Public Health Services and <br /> reporting the results of the decommissioning to the SJCHD. <br /> Prior to decommissioning,the total well depth and the depth to the water table were <br /> measured in each well. The christy boxes were then removed:.Monitoringwell MW-4D was <br /> partially obstructed by a broken well cap which was removed prior to grouting. The grout <br /> mixture was mechanically mixed at a ratio of approximately 5 gallons of water per 94 lb, <br /> sack of Type I/II cement. The wells were then.pressure grouted through a tremmie pipe <br /> from the bottom of the well'to the surface. Grout was allowed to spill over into the christy <br /> box excavation. At locations within pave areas the upper 4 to 6.inches was backfilled with <br /> concrete to be flush with the surrounding pavement. Tli�grouting procedure was observed <br /> by Mary Meays from the San Joaquin County,Public Health Services, Environmental Health <br /> Division. The well locations are shown on Figure 1. Table 1 presents a summary of the well <br /> decommissioning details. <br /> If you have any questions,please do not hesitate to contact the undersigned. <br /> Sincerely, <br /> GOLDER ASSOCIATES INC. <br /> M.June James,P.E. <br /> Project Engineer <br /> Diane L.Sarmiento,P.E. <br /> Senior Engineer <br /> MJJ/DLS/ca <br /> Attachment: Table l - Monitoring.Well Decommissioning Details <br /> Figure 1 - Site Plan <br /> cc: Mr.Jeff Lawson <br /> c/o Reed Elliott Creech and Roth <br /> 99 Almaden Boulevard,Eighth Floor . . <br /> San Jose,California 95113-1606 <br /> 9587001,05 Golder.Associates <br />