Laserfiche WebLink
WHF Environmental loonsultants, Inc. <br />' Health & Sgfety Plan a <br /> Page. 3 <br /> 2.0 SAFETY IMPLEMENTATION <br /> The provisions of the WHF Environmental Consultants, Inc Health and Safety Plan <br /> are mandatory for all personnel associated with the site project and operations <br /> A complete background review and site visitation will be conducted in order to deter- <br /> mine whether specific amendments are to be made to the Health and Safety Plan based <br /> on specific characteristics which may exist on the Job site Any suspected hazards <br /> associated with the on-site operation which exposure to, via inhalation or skin absorp- <br /> tion, to such as suspected carcinogens or human stenlants, will be documented and <br /> specific guidance will be developed and added to this Health and Safety Plan as <br /> Appendices <br /> A defined project site layout is paramount to the safe completion of all remedial site in- <br /> vestigations The project site layout has built-in safety features The site is dirtdcd into <br /> three zones The following last defines the required personnel protective equipment <br /> 2.1 Personnel Protective Equipment (PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site <br /> will use the following protective equipment and measures as wariwit by the <br /> Project ]`Tanager <br /> - Coveralls as an undergarment <br /> Saranex outer garment <br /> - Sample gloves (inner) <br /> - PVC, Nitrile or Neoprene outer gloves <br /> -- Hard hat <br /> - Steel toe boots <br /> - Robars or Tingley boots <br /> - Full face-piece respirator with R53HE cartridges (a combination of <br /> I organic vapor, acid gas, pesticide, radionuclide, high efficiency filter) <br /> Note that cartridges should be changed daily <br /> - All joints to be taped <br /> I - Self--contained air will be utilized if project dictates <br /> I <br />