Laserfiche WebLink
a .. nin <br /> TABLE OF CONTENTS <br /> Pau <br /> LIST OF FIGURES <br /> SECTION 1 <br /> PRELIMINARY EVALUATION OF TANK SITES 1-1 <br /> Tank Histories 1-1 <br /> Preliminary Tank Survey 1-1 <br /> Utilities 1-2 <br /> SECTION 2 <br /> PROCEDURES FOR CLOSURE OF THE UNDERGROUND STORAGE <br /> TANKS 2-1 <br /> Tank Removals 2.1 <br /> Emptying 2-1 <br /> Inerting 2-1 <br /> Tank Removal and Disposal 2.2 <br /> Backfilling 2-2 <br /> Soil and Groundwater Sampling 2-2 <br /> Soil Sampling 2-2 <br /> Groundwater Sampling 2-3 <br /> Laboratory 2-3 <br /> Analyses 2-3 <br /> SECTION 3 <br /> REPORTING OF FINDINGS 3-1 <br /> Problem Assessment Report 3-1 <br /> SECTION 4 <br /> _ SITE-SPECIFIC HEALTH AND SAFETY PLAN 4-1 <br /> Physic Hazar s <br /> . ............ <br /> Chemical Hazards 4-2 <br /> Training 4-2 <br /> Emergency Procedures 4-3 <br /> i <br />