Laserfiche WebLink
P Y <br /> r' <br /> er <br /> SECTION 2 <br /> pR®CEDURES FOR CLOSURE O THE <br /> TANKS <br /> UNDERGROUND STORAGE <br /> Section 2 describes the proposed procedures for removal and disposal <br /> the underground stand their contents <br /> , soil and <br /> g tivof excavated <br /> groundwater sampling,, backfilling, <br /> ackfill ng, andhandling <br /> material. <br /> Tank RemOvais <br /> Jim Dobbas, Inc. (Dobbas)located in Newcastle, California will be the <br /> lead contractor responsible for removal of the tanks. Dob�:as is a <br /> California licensed contractor,license number 479128• Dobbas will be <br /> responsible for emptying and disposing of the tank contents;g n ERM- <br /> removal and disposal of the tanks; backfilling; and pa <br /> West, Inc. will be responsible for <br /> submittal o£project <br /> mentag ement, soil <br /> and groundwater sampling, <br /> and n. <br /> n Dobbas will <br /> The initial task for each tank will be emptying. <br /> U.S. EPA 1D No. <br /> subcontract the work to Ramos Oil, Sacramento, <br /> tanks,and transport the <br /> CAD 044003556. Ramos will empty The manifest <br /> product under manifest to their facility for recycling. <br /> will list Catellus Development Corporation as the generator. <br /> After the tanks are emptied, Dobbas h l inertStocto e tanksiepartment. <br /> ice <br /> following guidelines provided by <br /> Following insertion of the dry ice, the LEL and/or oxygen level(s) will <br /> be monitored in the tan{t with a combustible gas meter and/or oxygen <br /> level meter. When the /rox oxygen <br /> below the <br /> value(s) stated in the guidelines, n will commence <br /> 2-1 <br />