Laserfiche WebLink
Ms. Mary Meays Page 2 <br /> .July 15, 1991 <br /> 10 to 15 feet. The remainder of the boring, from 15 to 30 feet, was filled with <br /> sand. Both wells were secured with traffic boxes at the ground surface. <br /> Standard ERM-West, Inc. Quality Assurance/Quality Control (QA/QC) <br /> procedures were followed throughout the construction <br /> process. All <br /> The were decontaminated by steam cleaning p tdrilling <br /> each split spoon sampler was decontaminated prior to each use by washing in an <br /> Alconox solution followed by a clean water rinse. The brass tube liners for <br /> the sampler were similarly cleaned prior to use. The well casing and <br /> screen were cleaned and decontaminated by steam cleaning prior to use. <br /> Soil cuttings from each boring were placed in labeled 55-gallon drums and <br /> stored on site. <br /> Well Development gnd Water Eampliag <br /> Following construction, the new wells were developed by hand-bailing <br /> approximately 15 to 18 gallons (or 12 to 13 well volumes) from each well. <br /> The bailing was continued until temperature, pH, and conductivity <br /> stabilized, and the silt content of the discharge water declined markedly <br /> (Table 1). The pre-existing wells were purged by bailing a similar volumcr 'if <br /> water. <br /> QA/QC procedures were followed during development and purging. Price <br /> to work at each well, the bailer was cleaned and decontaminated with an <br /> Alconox solution followed by a clean water rinse. Bailer cord was replaced <br /> in between sampling at each location. Bailed water and water from the <br /> decontamination procedures was contained in 55-gallon drums and stored <br /> on site. <br /> After development and purging procedures were completed, all wells were <br /> sampled. The wells were sampled with a pre-cleaned Teflon bailer <br /> equipped with a removable petcock. Water was transferred from the bailer <br /> into laboratory-supplied bottles. All samples (water and soil)provided to the <br /> laboratory were labeled and sealed individually in zip-lock type plastic bags, <br /> then placed on ice in a cooler. <br /> Soil and Water Analyses <br /> J <br /> The soil and water samples were submitted to Curtis &Tompkins, Ltd., a <br /> California Department of Health Services (DHS) certified laboratory located <br /> in Berkeley, California. The samples were shipped under chain-of-custody <br /> and analyzed according to the following test procedures: <br /> • Total Petroleum Hydrocarbons as Gasoline EPA Method 8015- <br /> - Modified; <br />