Laserfiche WebLink
g. TOWER LIGHTS: For safety purposes, the communications tower shall be lighted according to <br /> the following: <br /> (1) A red light shall be placed at or near the top of the tower. <br /> h. STORM DRAINAGE: Any additional storm water drainage created by new improvements shall <br /> be retained on the site. The drainage pattern and corresponding storm drain improvements shall <br /> be shown on the Site Plan. Drainage calculations prepared by a registered civil engineer or <br /> architect shall be included. (Development Title Section 9-1135) <br /> 2. DEPARTMENT OF PUBLIC WORKS (See attached memo dated October 27, 2005). <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT (See attached memo dated October 25, 2005). <br /> 4. OFFICE OF EMERGENCY SERVICES (See attached memo dated October 17, 2005). <br /> Conditions of Approval -2 - PA-0500655 <br />